INSTALLATION
a.Check that the device at the other end of the link has power.
b.Verify that the fiber strands are properly
c.Verify that the fiber connection meets the dB loss limit specifications outlined in Chapter 2.
d.Check that the port is enabled through
e.If a link still can not be established, contact Cabletron Systems Technical Support.
3.10 CHECKING THE INSTALLATION
To check MicroMMAC-T installation:
1.Trace the ring path through the network to be sure that there are no breaks in the ring and that it is free from logical design errors.
a.Check that each cable connection is secure and logically correct.
b.Verify the pinouts for each connection.
c.Use a cable tester to check the cable conductors for continuity.
2.Check that all devices operating on the same network are set to the same ring speed.
3.Ensure that the maximum number of stations is not exceeded.
4.Ensure that the maximum cable length to each station is not exceeded.
5.Ensure that the networking software is configured properly to match the installed network.
When these checks are successfully cleared, the
If problems still occur, contact your Cabletron Technical Support representative.