Cabletron Systems 2200 manual Garp Switch Operation, 12 802.1 Port Priority, Management

Page 26

Overview

1.1.11 GARP Switch Operation

Some or all ports on the switch may be activated to operate under the Generic Attribute Registration Protocol (GARP) applications, GARP VLAN Registration Protocol (GVRP) and/or GARP Multicast Registration Protocol (GMRP).

GARP is a protocol, or set of rules, that outlines a mechanism for propagating the port state and/or user information throughout a bridged LAN to keep track of users and VLANs on the network fabric. MAC bridges and end users alike can take part in the registration and de-registration of GARP attributes such as VLAN and multicast group membership. For more details on how GVRP and GMRP handle frames under GARP, and how to configure the switch ports to take advantage of this operation, refer to the Cabletron Systems SmartSwitch Series 2E253, 2H252, 2H253, and 2H258 Local Management User’s Guide.

1.1.12 802.1 Port Priority

The 802.1 port priority is used to assign a default priority to the frames received without priority information in their tag header, map prioritized frames to the appropriate transmit queues, and prioritize frames according to protocol type. The 802.1 port priority is part of the IEEE 802.1D standard.

1.1.13 Management

Management of the 2E253-49R is accomplished using SNMP compliant management tools for in-band Local Management. Out-of-band Local Management is provided through the RJ45 COM port on the front panel using a VT100 terminal or a VT100 terminal emulator. In-band remote management is possible through any SNMP compliant Network Management Software.

Local Management described in the Cabletron Systems SmartSwitch Series 2E253, 2H252, 2H253, and 2H258 Local Management User’s Guide provides the ability to manage the

2E253-49R, and optional HSIMs and VHSIMs that support Ethernet. For information about Local Management for optional non-Ethernet HSIMs or VHSIMs, refer to their respective user’s guide.

1.1.14 Switching Options

The 2E253-49R provides 802.1Q switching or SecureFast Switching Virtual Network Services between all of the front panel interfaces including the optional HSIM or VHSIM interface. In the 802.1Q mode (the default mode of operation), the 2E253-49R functions as an 802.1D switch until VLANs are configured.

IEEE 802.1Q switching and SecureFast switching allow migration to Virtual Network technologies without requiring the replacement of existing equipment.

1-6Introduction

Image 26
Contents 2E253-49R SmartSwitch Installation User’s Guide Page Page FCC Notice Cabletron SYSTEMS, INC Program License Agreement Page Page Page Cabletron Systems Limited Program License Agreement Viii Declaration of Conformity Page Contents Troubleshooting Figures Tables Structure of this Guide Using this GuideAbout This Guide Related Documents XviDocument Conventions Document ConventionsPage Introduction OverviewFull Duplex Switched Ethernet ConnectivitySmartTrunk Standard/Full Duplex Auto-NegotiationRuntime IP Address Discovery Port/VLAN Redirect Functions Remote Monitoring RmonBroadcast Suppression Traffic Rate Limiting Flow Control12 802.1 Port Priority Garp Switch OperationSwitching Options ManagementStandards Compatibility Lanview Diagnostic LEDsOptional HSIMs and VHSIMs Year 2000 ComplianceGetting Help FTPNetwork Requirements 10BASE-T NetworkPage Installation Installing Options Unpacking the DeviceInstalling the Device Tabletop or Shelf InstallationRackmount Installation Guidelines for the Rackmount InstallationAttaching the Strain-Relief Bracket Rack Mounting the 2E253-49R Connecting Power Installing the Device in a RackConnecting to the Network Redundant Primary AC outlets are On separate circuitsConnection Using the RJ21 Angle Adapter Completing the Installation Troubleshooting Using LanviewPWR No link Is enabled and there is a Troubleshooting Checklist OFF2E253, 2H252, 2H253, and 2H258 Local Using the Reset Button Reset ButtonPage Physical Properties Device SpecificationsSpecifications INPUT/OUTPUT Ports Electrical SpecificationsEnvironmental Requirements COM Port Pinout Assignments Regulatory CompliancePage Optional Installations Mode Switch Bank Settings Required ToolsRemoving the Chassis Cover To remove the chassis cover, proceed as follows Screws Chassis Cover Front Panel Setting the Mode Switches Switch 6 Forced BootPSimm Upgrade Figure B-3shows the location of the Dram Simm connector Locating SIMMsInstalling the Dram Simm SimmInstalling Optional Hsim or Vhsim Interface Modules Figure B-5 Hsim and Vhsim Connector LocationsPage Index NumericsIndex-2