Cabletron Systems 2200 manual Guidelines for the Rackmount Installation

Page 34

Installing the Device

B

36

ETHERNET WORKGROUP SWITCH

A

 

12

 

PWR

2E253-49R

RESETCOM CPU

A = 15 cm (6 in)

B = 57 cm (22.5 in) C = 53 cm (21 in) D = 213 cm (7 ft)

25

1

48

24

C

37

 

4

8

12

16

20

24

28

3

36

40

4

48

13

3

7

11

15

19

23

27

31

35

39

43

47

 

2

6

10

14

18

22

26

30

34

38

42

46

 

1

5

9

13

17

2

25

29

33

37

41

45

D

2600-02

Figure 3-1 Tabletop or Shelf Installation

3.3.2Rackmount Installation

To install the 2E253-49R in a 19-inch rack, Cabletron Systems includes a strain-relief bracket for cable management and an accessory kit containing the rackmount brackets, and mounting screws to attach the rackmount brackets and strain-relief bracket.

Guidelines for the Rackmount Installation

The installation site must be within reach of the network cabling and meet the requirements listed below:

An appropriate grounded power receptacle must be located within seven feet of the location.

Maintain a temperature of between 5°C (41°F) and 40°C (104°F) at the installation site with fluctuations of less than 10°C (18°F) per hour.

To ensure proper ventilation and prevent overheating, leave a minimum clearance space

!of 5.1 cm (2.0 in) at the left, right, and rear of the 2E253-49R.

CAUTION

WARNING

Before installing the 2E253-49R into a rack, ensure that the rack supports the device(s) without compromising the stability of the rack. Otherwise, personal injury and/or equipment damage may result.

3-4Installation

Image 34
Contents 2E253-49R SmartSwitch Installation User’s Guide Page Page FCC Notice Cabletron SYSTEMS, INC Program License Agreement Page Page Page Cabletron Systems Limited Program License Agreement Viii Declaration of Conformity Page Contents Troubleshooting Figures Tables About This Guide Using this GuideStructure of this Guide Related Documents XviDocument Conventions Document ConventionsPage Introduction OverviewFull Duplex Switched Ethernet ConnectivityRuntime IP Address Discovery Standard/Full Duplex Auto-NegotiationSmartTrunk Broadcast Suppression Remote Monitoring RmonPort/VLAN Redirect Functions Traffic Rate Limiting Flow Control12 802.1 Port Priority Garp Switch OperationSwitching Options ManagementStandards Compatibility Lanview Diagnostic LEDsOptional HSIMs and VHSIMs Year 2000 ComplianceGetting Help FTPNetwork Requirements 10BASE-T NetworkPage Installation Installing Options Unpacking the DeviceInstalling the Device Tabletop or Shelf InstallationRackmount Installation Guidelines for the Rackmount InstallationAttaching the Strain-Relief Bracket Rack Mounting the 2E253-49R Connecting Power Installing the Device in a RackConnecting to the Network Redundant Primary AC outlets are On separate circuitsConnection Using the RJ21 Angle Adapter Completing the Installation Troubleshooting Using LanviewPWR No link Is enabled and there is a Troubleshooting Checklist OFF2E253, 2H252, 2H253, and 2H258 Local Using the Reset Button Reset ButtonPage Specifications Device SpecificationsPhysical Properties Environmental Requirements Electrical SpecificationsINPUT/OUTPUT Ports COM Port Pinout Assignments Regulatory CompliancePage Optional Installations Mode Switch Bank Settings Required ToolsRemoving the Chassis Cover To remove the chassis cover, proceed as follows Screws Chassis Cover Front Panel Setting the Mode Switches Switch 6 Forced BootPSimm Upgrade Figure B-3shows the location of the Dram Simm connector Locating SIMMsInstalling the Dram Simm SimmInstalling Optional Hsim or Vhsim Interface Modules Figure B-5 Hsim and Vhsim Connector LocationsPage Index NumericsIndex-2