Sun Microsystems 816-7727-10 manual Install the Server Into the Cabinet

Page 24

!

!

Install the Server Into the Cabinet

Caution – Before you install or remove the server from the cabinet, be sure the cabinet is stabilized so that it cannot move or tip forward. See the cabinet documentation for information about stabilizing the cabinet.

Caution – The server is heavy. Two persons are required to move the server.

Note – Make sure that each slide assembly is fully retracted into the cabinet and check that the ball-bearing runner on each slide assembly is all the way forward.

1.With one person on each side of the server, lift the server and approach the cabinet with the back of the server facing the front of the cabinet.

Note – Do not use the vent holes in the server doors as “handles” to lift the server.

2.Align the rounded ends of the inner glides on the server with the slide assemblies in the cabinet.

Note – Make sure that the inner glides attached to the server are inserted within the ball-bearing runners.

16 Sun Fire V440 Server Installation Guide • July 2003

Image 24
Contents Sun Fire V440 Server Installation Guide Please Recycle Contents Setup and Power -On Procedures Background and ReferencePreface How This Book Is OrganizedUsing Unix Commands Typographic ConventionsSystem Prompts Related DocumentationAccessing Sun Documentation Contacting Sun Technical SupportSun Welcomes Your Comments Preparing for Installation About the Parts Shipped to YouVerify All Parts Verify that you have received all the parts of your systemPlan the Installation Transfer Online DocumentationWhat Next Installing a Sun Fire Server Into a 4-Post Cabinet Checklist of 4-Post Rackmounting Tasks Inventory for 4-Post Rackmounting Tools Required for Rackmounting Attach the Inner Glides to the Chassis Prepare the Cabinet Remove the side panels from the cabinet, if applicableLocate the Mounting Holes To use the Rack Alignment template, complete these steps Install the Slide Assemblies Sun Fire V440 Server Installation Guide July Installing a Sun Fire V440 Server Into a 4-Post Cabinet Install the Server Into the Cabinet Installing a Sun Fire V440 Server Into a 4-Post Cabinet Sun Fire V440 Server Installation Guide July What Next Install the Cable Management Arm Captive screw Slot Tab Mounting hole Inner glide Sun Fire V440 Server Installation Guide July Installing a Sun Fire V440 Server Into a 4-Post Cabinet Locate the speed pin on the end of the cable management arm Secure the Cords and Cables to the Cable Management Arm Upper lip Velcro straps Oval cutouts First section Oval cutouts Install Optional Components Install any optional components shipped with your systemConnecting the Cords and Cables Port InformationConnect the Power Cords to the Server PCI Choose a network port, using the following table as a guide Connect Twisted-Pair Ethernet CablesInstalling a Sun Fire V440 Server Into a 4-Post Cabinet Restore the Cabinet Setup and Power-On Procedures Set Up a System Console DeviceAbout Connecting the Server to a Terminal Server Terminal Straight-through cable Server Open a terminal session on the connecting device, and type Turn off power to the alphanumeric terminalHow to Access the System Console via tip Connection A terminal window on the other Sun system, type Prepare to Configure the Primary Network Interface Choose a host name for the server and make a note of itPower On the Server How to Power On via the Power Button How to Power On via the poweron Command Turn the system control keyswitch to the Locked positionPower button Standby Keyswitch Normal Locked Diagnostics At the Alom sc prompt, type the poweron command sc poweron Quickly enter the console command sc consoleSetup and Power-On Procedures What Next Background and Reference System LEDsFollowing table describes the power supply LEDs Serial Port Connector Serial Port Connector SignalsPost Cabinet Requirements Table A-44-Post Cabinet RequirementsTable A-44-Post Cabinet Requirements Sun Fire V440 Server Installation Guide July