Sun Microsystems 816-7727-10 manual Install the Cable Management Arm

Page 28

Install the Cable Management Arm

This procedure describes how to attach the cable management arm to a server that is already installed in a cabinet.

You need the following components from the ship kit and the rackmounting kit to install the cable management arm and to connect the cords and cables:

Cable management arm

Ethernet (RJ-45) cable

You also need two AC power cords, which are not supplied.

AC power cords (2)

(Not supplied in kit)

Ethernet RJ-45 cable

Cable management arm

1.Loosen the four screws that secure the system to the left and right vertical rails at the front of the cabinet.

2.Slide the server smoothly out of the cabinet about 3 inches (7.62 cm).

Sliding the server out of the cabinet enables easy access to the areas where you will attach the cable management arm.

3.Attach one end of the cable management arm to the inner glide.

20 Sun Fire V440 Server Installation Guide • July 2003

Image 28
Contents Sun Fire V440 Server Installation Guide Please Recycle Contents Setup and Power -On Procedures Background and ReferencePreface How This Book Is OrganizedUsing Unix Commands Typographic ConventionsSystem Prompts Related DocumentationContacting Sun Technical Support Accessing Sun DocumentationSun Welcomes Your Comments Preparing for Installation About the Parts Shipped to YouVerify All Parts Verify that you have received all the parts of your systemPlan the Installation Transfer Online DocumentationWhat Next Installing a Sun Fire Server Into a 4-Post Cabinet Checklist of 4-Post Rackmounting Tasks Inventory for 4-Post Rackmounting Tools Required for Rackmounting Attach the Inner Glides to the Chassis Prepare the Cabinet Remove the side panels from the cabinet, if applicableLocate the Mounting Holes To use the Rack Alignment template, complete these steps Install the Slide Assemblies Sun Fire V440 Server Installation Guide July Installing a Sun Fire V440 Server Into a 4-Post Cabinet Install the Server Into the Cabinet Installing a Sun Fire V440 Server Into a 4-Post Cabinet Sun Fire V440 Server Installation Guide July What Next Install the Cable Management Arm Captive screw Slot Tab Mounting hole Inner glide Sun Fire V440 Server Installation Guide July Installing a Sun Fire V440 Server Into a 4-Post Cabinet Locate the speed pin on the end of the cable management arm Secure the Cords and Cables to the Cable Management Arm Upper lip Velcro straps Oval cutouts First section Oval cutouts Install Optional Components Install any optional components shipped with your systemConnecting the Cords and Cables Port InformationConnect the Power Cords to the Server PCI Choose a network port, using the following table as a guide Connect Twisted-Pair Ethernet CablesInstalling a Sun Fire V440 Server Into a 4-Post Cabinet Restore the Cabinet Setup and Power-On Procedures Set Up a System Console DeviceAbout Connecting the Server to a Terminal Server Terminal Straight-through cable Server Open a terminal session on the connecting device, and type Turn off power to the alphanumeric terminalHow to Access the System Console via tip Connection A terminal window on the other Sun system, type Prepare to Configure the Primary Network Interface Choose a host name for the server and make a note of itPower On the Server How to Power On via the Power Button How to Power On via the poweron Command Turn the system control keyswitch to the Locked positionPower button Standby Keyswitch Normal Locked Diagnostics At the Alom sc prompt, type the poweron command sc poweron Quickly enter the console command sc consoleSetup and Power-On Procedures What Next Background and Reference System LEDsFollowing table describes the power supply LEDs Serial Port Connector Serial Port Connector SignalsPost Cabinet Requirements Table A-44-Post Cabinet RequirementsTable A-44-Post Cabinet Requirements Sun Fire V440 Server Installation Guide July