1.4.7Verifying Operation of the Slide-Rails and CMA
Use this procedure to ensure that the
Note – This procedure can be performed more easily by two people: one to move the server in and out of the rack, and one to observe the cables and CMA.
1.Slowly pull the server out of the rack until the
2.Inspect the attached cables for any binding or kinks.
3.Verify that the CMA extends fully from the
4.Push the server back into the rack.
When the server is fully extended, you must release two sets of
a.The first set of stops are levers, located on the inside of each
The server travels approximately 15 inches (38 cm) and stops.
Verify that the cables and the CMA retract without binding before continuing.
b.The second set of stops are the
5.Adjust the cable hangers and CMA as required.
6.Continue with Section 1.5, “Cabling the Server” on page
1.5Cabling the Server
Connect the server and external devices in this order (see FIGURE
1.Connect the server power cord to a grounded electrical outlet.
2.If needed, connect the keyboard and mouse to the USB connectors on the front or back panel.
3.If needed, connect the monitor cable to the onboard video connector.