Paradyne 2600 IP DSLAM manual Mounting Configurations, Mounting Brackets

Page 16

1. Installation

Mounting Configurations

Three basic installation configurations are available:

￿Rack mount – see Installing the Brackets for Rack Mounting on page 1-6and Installing the BitStorm 2600 Into a Rack on page 1-8.

￿Wall mount – see Installing the BitStorm 2600 on a Wall on page 1-10.

￿Shelf or desktop – see Installing the BitStorm 2600 on a Shelf or Desktop on page 1-12.

Mounting Brackets

Your BitStorm 2600 can be installed in a rack or on the wall using mounting brackets. Two brackets suitable for a 19-inch (483 mm) rack (marked EIA-19) and two brackets suitable for a 23-inch (584 mm) Bay Networks or Nortel rack (marked with Paradyne Part Number 868-6282-0020) are shipped with the unit. Two brackets suitable for a 21-inch (535 mm) rack (marked ETSI) are available from Paradyne as a separate feature (see Appendix B, Equipment List).

Rack-mounting brackets may also be used to attach the unit to a wall.

NOTE:

In this guide, the term rack refers to any rack, cabinet, frame, or bay suitable for mounting telecommunications equipment.

Installing the Brackets for Rack Mounting

Procedure

To install the mounting brackets for rack mounting:

1.Locate the black screw nearest the front panel on each side of the unit as shown.

1

3

5

7

 

 

 

 

 

 

 

 

2

4

6

8

9

11

13

15

17

 

 

 

 

 

 

 

10

12

14

16

19

21

23

 

 

 

 

 

 

 

 

18

20

22

24

 

 

 

 

 

 

 

 

 

 

DSL PORTS 1-24

POTS 1-24

03-17445

2. Remove these two black screws (one from each side) before attempting to install the mounting brackets.

1-6

January 2004

2600-A2-GN20-10

Image 16
Contents IP Dslam Copyright 2004 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan January Contents Configuration Connectors and Pin AssignmentsEquipment List Technical Specifications Index LEDsDocument Purpose and Intended Audience About This GuideDocument Summary Related Product Documents Document Number Document TitleInstallation OverviewInstallation Site PreparationCables Required DSL PortsPackage Contents Unpacking the HardwareFlat-head screw for attaching 19 mounting brackets to Installing the Brackets for Rack Mounting Mounting ConfigurationsMounting Brackets Inch 483 mm Rack Mount Installing the BitStorm 2600 Into a Rack 03-17436 Installing the BitStorm 2600 on a Wall 17.85 in 453 mm Installing the BitStorm 2600 on a Shelf or Desktop Cabling Cabling OverviewDSL Ports GigE Uplink Port 10/100BaseT Uplink Port Chaining BitStorm 2600s Management Port Connecting a Terminal or PC to the Console Port Console PortConnecting a Modem to the Console Port Alarm Interface Ground Connecting to Power Cabling January LEDs LED LocationsLED Meanings LEDConfiguration Conventions UsedUsing the CLI CLI Commands FunctionConfigure Management Inband Address BitStorm 2600 Startup Procedure LoginStartup Procedure for Inband Management Startup Procedure for Out-of-Band ManagementUsing the Web Interface Configuration / Management / Snmp System / UsersProcedure Connectors and Pin Assignments Figure A-1. BitStorm 2600 IP Front PanelDSL Ports and Pots Splitter Connectors Port 1 and Port 2 10/100BaseT Connectors Port 3 1000BaseT ConnectorPort 3 GigE SFP Connector Table A-4. Port 3 GigE Connector Signal PinConsole Port Connector Alarm Connector Table A-6. Alarm Connections Signal Direction ContactEquipment List Description Model NumberEquipment List Technical Specifications DSLTable C-1. BitStorm 2600 Technical Specifications 2 Criteria Index NumericsIN-2 IN-3 IN-4