Paradyne 2600 IP DSLAM manual Installing the BitStorm 2600 Into a Rack

Page 18

1. Installation

Installing the BitStorm 2600 Into a Rack

Two types of mounting screws are provided. Use:

￿#10-32 mounting screws for rails with threaded screw holes

￿#12-24 mounting screws and self-retaining nuts for rails with unthreaded screw holes

Procedure

To install the BitStorm 2600 into a rack:

1.Determine where in the rack you will mount the BitStorm 2600. If your rack does not have threaded screw holes, slip self-retaining nuts onto the rails where the BitStorm 2600 will be fastened.

02-17070

2.Place the unit so that the brackets rest against the front of the rails. Insert screws in the bottom screw positions and hand-tighten them.

1-8

January 2004

2600-A2-GN20-10

Image 18
Contents IP Dslam Copyright 2004 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan January Contents Equipment List Technical Specifications Index ConfigurationConnectors and Pin Assignments LEDsAbout This Guide Document Purpose and Intended AudienceDocument Summary Related Product Documents Document Number Document TitleInstallation OverviewInstallation Site PreparationCables Required DSL PortsPackage Contents Unpacking the HardwareFlat-head screw for attaching 19 mounting brackets to Mounting Configurations Installing the Brackets for Rack MountingMounting Brackets Inch 483 mm Rack Mount Installing the BitStorm 2600 Into a Rack 03-17436 Installing the BitStorm 2600 on a Wall 17.85 in 453 mm Installing the BitStorm 2600 on a Shelf or Desktop Cabling Cabling OverviewDSL Ports GigE Uplink Port 10/100BaseT Uplink Port Chaining BitStorm 2600s Management Port Connecting a Terminal or PC to the Console Port Console PortConnecting a Modem to the Console Port Alarm Interface Ground Connecting to Power Cabling January LEDs LED LocationsLED Meanings LEDConfiguration Conventions UsedUsing the CLI CLI Commands FunctionConfigure Management Inband Address BitStorm 2600 Startup Procedure LoginStartup Procedure for Inband Management Startup Procedure for Out-of-Band ManagementUsing the Web Interface Configuration / Management / Snmp System / UsersProcedure Connectors and Pin Assignments Figure A-1. BitStorm 2600 IP Front PanelDSL Ports and Pots Splitter Connectors Port 1 and Port 2 10/100BaseT Connectors Port 3 1000BaseT ConnectorPort 3 GigE SFP Connector Table A-4. Port 3 GigE Connector Signal PinConsole Port Connector Alarm Connector Table A-6. Alarm Connections Signal Direction ContactEquipment List Description Model NumberEquipment List Technical Specifications DSLTable C-1. BitStorm 2600 Technical Specifications 2 Criteria Index NumericsIN-2 IN-3 IN-4