Paradyne 2600 IP DSLAM manual Installing the BitStorm 2600 on a Wall

Page 20

1. Installation

Installing the BitStorm 2600 on a Wall

Wall mounting requires two wood screws suitable for the weight of the fully cabled unit. These are not included. Use at a minimum 1/4-inch (6 mm) diameter screws in 3/4-inch (19 mm) plywood (not drywall).

Procedure

To install the BitStorm 2600 on a wall:

1.Identify the flat-head screws provided in the hardware kit and the brackets suitable for a 19-inch rack. Two screws are required for each bracket.

2.Orient the unit so that the bottom is facing you and the faceplate is at the top.

3.Locate the supplied Right Side mounting bracket and fasten it to the right side of the unit.

2600

03-17438

4.Locate the supplied Left Side mounting bracket and fasten it to the left side of the unit.

5.Tighten all screws firmly.

1-10

January 2004

2600-A2-GN20-10

Image 20
Contents IP Dslam Copyright 2004 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan January Contents Configuration Connectors and Pin AssignmentsEquipment List Technical Specifications Index LEDsDocument Summary About This GuideDocument Purpose and Intended Audience Related Product Documents Document Number Document TitleInstallation OverviewInstallation Site PreparationCables Required DSL PortsPackage Contents Unpacking the HardwareFlat-head screw for attaching 19 mounting brackets to Mounting Brackets Mounting ConfigurationsInstalling the Brackets for Rack Mounting Inch 483 mm Rack Mount Installing the BitStorm 2600 Into a Rack 03-17436 Installing the BitStorm 2600 on a Wall 17.85 in 453 mm Installing the BitStorm 2600 on a Shelf or Desktop Cabling Cabling OverviewDSL Ports GigE Uplink Port 10/100BaseT Uplink Port Chaining BitStorm 2600s Management Port Connecting a Terminal or PC to the Console Port Console PortConnecting a Modem to the Console Port Alarm Interface Ground Connecting to Power Cabling January LEDs LED LocationsLED Meanings LEDConfiguration Conventions UsedUsing the CLI CLI Commands FunctionConfigure Management Inband Address BitStorm 2600 Startup Procedure LoginStartup Procedure for Inband Management Startup Procedure for Out-of-Band ManagementUsing the Web Interface Configuration / Management / Snmp System / UsersProcedure Connectors and Pin Assignments Figure A-1. BitStorm 2600 IP Front PanelDSL Ports and Pots Splitter Connectors Port 1 and Port 2 10/100BaseT Connectors Port 3 1000BaseT ConnectorPort 3 GigE SFP Connector Table A-4. Port 3 GigE Connector Signal PinConsole Port Connector Alarm Connector Table A-6. Alarm Connections Signal Direction ContactEquipment List Description Model NumberEquipment List Technical Specifications DSLTable C-1. BitStorm 2600 Technical Specifications 2 Criteria Index NumericsIN-2 IN-3 IN-4