1. Installation

Installing the BitStorm 2600 on a Shelf or Desktop

If the BitStorm 2600 will be placed on a shelf or desktop, install the provided rubber feet before putting the unit in position.

Procedure

To install the BitStorm 2600 on a shelf or desktop, as a standalone unit or in a stack:

1.Locate the rubber feet in the hardware kit provided with the unit.

2.Turn the unit upside down on a work surface. Squares stamped into the bottom of the unit show the proper positions for the feet.

3.Remove the protective sheet from the bottom of each foot, then press the foot onto a corner of the bottom of the unit.

03-17439

4.Turn the unit right side up and place it in position on a shelf or desktop.

If the installation includes more than one unit, one can be stacked atop another. Up to five units can be stacked together.

1-12

January 2004

2600-A2-GN20-10

Image 22
Contents IP Dslam Copyright 2004 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan January Contents Equipment List Technical Specifications Index ConfigurationConnectors and Pin Assignments LEDsDocument Purpose and Intended Audience About This GuideDocument Summary Related Product Documents Document Number Document TitleInstallation OverviewInstallation Site PreparationCables Required DSL PortsPackage Contents Unpacking the HardwareFlat-head screw for attaching 19 mounting brackets to Installing the Brackets for Rack Mounting Mounting ConfigurationsMounting Brackets Inch 483 mm Rack Mount Installing the BitStorm 2600 Into a Rack 03-17436 Installing the BitStorm 2600 on a Wall 17.85 in 453 mm Installing the BitStorm 2600 on a Shelf or Desktop Cabling Cabling OverviewDSL Ports GigE Uplink Port 10/100BaseT Uplink Port Chaining BitStorm 2600s Management Port Connecting a Terminal or PC to the Console Port Console PortConnecting a Modem to the Console Port Alarm Interface Ground Connecting to Power Cabling January LEDs LED LocationsLED Meanings LEDConfiguration Conventions UsedUsing the CLI CLI Commands FunctionConfigure Management Inband Address BitStorm 2600 Startup Procedure LoginStartup Procedure for Inband Management Startup Procedure for Out-of-Band ManagementUsing the Web Interface Configuration / Management / Snmp System / UsersProcedure Connectors and Pin Assignments Figure A-1. BitStorm 2600 IP Front PanelDSL Ports and Pots Splitter Connectors Port 1 and Port 2 10/100BaseT Connectors Port 3 1000BaseT ConnectorPort 3 GigE SFP Connector Table A-4. Port 3 GigE Connector Signal PinConsole Port Connector Alarm Connector Table A-6. Alarm Connections Signal Direction ContactEquipment List Description Model NumberEquipment List Technical Specifications DSLTable C-1. BitStorm 2600 Technical Specifications 2 Criteria Index NumericsIN-2 IN-3 IN-4