TP-Link TL-SG3424 manual 4444Initialization, For TL-SG3210 Switch

Page 21

L2 Managed Switch

FFFFFFFFFFFFConnecting to Power Supply

Note: The figure is to illustrate the application and principle. The power cord you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above.

4444Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indicators will respond as follows.

For TL-SG3210 Switch:

The Power LED indicator will light on all the time.

The LED indicators of all the ports will light on for several seconds and then turn off after the initialization.

The System LED indicator will flash, which represents a successful initialization.

For TL-SG3216/TL-SG3424/TL-SG3424P Switch:

The Power LED indicator will light on all the time.

After keeping off for several seconds, the LED indicators of all the ports will flash momentarily and then turn off again after the initialization.

The System LED indicator will flash, which represents a successful initialization.

Connection 17

Image 21
Contents Installation Guide Copyright & Trademarks FCC Statement Audience Contents Product Overview CCCCCCCCCCCIntroductionAppearance Front PanelLEDs Front panel of TL-SG3424P is shown as the following figure Rear Panel Port FeatureGrounding Terminal CCCCCCCCCCCInstallation Package Contents2222Safety Precautions Clearness Electromagnetic InterferenceLightening Protection 2222Product Installation 2222Installation ToolsInstallation Site Desktop InstallationRack Installation Cabling Reasonably CCCCCCCCCCCLightning ProtectionRequirements for Cabling Outdoors Requirements for Cabling IndoorsEthernet Cable Connecting to the Grounding Bar Connecting to the Ground via the Power Supply3333Connect to Ground 3333Equipotential Bonding 3333Use Lightning Arrester CCCCCCCCCCCConnection Ethernet Port4444SFP Port 4444Verify Installation 4444Power On4444Console Port 4444Initialization For TL-SG3210 SwitchConfigure the Switch via GUI CCCCCCCCCCCConfigurationLogon by a Console Port 5555Configure the Switch Using CLISelect the port to connect in -6, and click OK Logon by Telnet Type cmd in the prompt Run window as -10 and click OK FFFFFFFFFFFFFLog in the Switch Qqqq Why does the Power LED work abnormally? AAAAAAAAAAAATroubleshootingAAAAAAAAAAAAHardware Specifications AAAAAAAAAAAATechnical Support L2 Managed Switch Tel +86 755 Mail support@tp-link.com 7106504453 REV2.0.0