TP-Link TL-SG3424 manual 4444Console Port, 4444Verify Installation, 4444Power On

Page 20

L2 Managed Switch

4444Console Port

CLI (Command Line Interface\ enables you to manage the switch, thus you can load the CLI after connecting the PCs or Terminals to the console port on the switch via the provided cable.

Connect the console port of the device with your computer by the console cable as the following figure shown.

FFFFFFFFFFFFConnecting the Console Port

You can also manage the device through the console port, for details please refer to the

CLI Reference Guide on the resource CD.

Note:

The console port is the first port on the left of the front panel.

Please keep the device power off when plugging the console cable. Do not connect the console port with other ports by RJ45 cable.

4444Verify Installation

After completing the installation, please verify the following items:

There are 5~10cm of clearance around the sides of the device for ventilation and the air flow is adequate.

The voltage of the power supply meets the requirement of the input voltage of the device.

The power socket, device and rack are well grounded.

The device is correctly connected to other network devices.

4444Power On

Plug the female connector of the provided power cord into the power socket of the device, and the male connector into a power outlet as the following figure shown.

16 Connection

Image 20
Contents Installation Guide Copyright & Trademarks FCC Statement Audience Contents CCCCCCCCCCCIntroduction Product OverviewAppearance Front PanelLEDs Front panel of TL-SG3424P is shown as the following figure Port Feature Rear PanelGrounding Terminal 2222Safety Precautions CCCCCCCCCCCInstallationPackage Contents Lightening Protection ClearnessElectromagnetic Interference 2222Installation Tools 2222Product InstallationInstallation Site Desktop InstallationRack Installation CCCCCCCCCCCLightning Protection Cabling ReasonablyRequirements for Cabling Outdoors Requirements for Cabling IndoorsEthernet Cable 3333Connect to Ground Connecting to the Grounding BarConnecting to the Ground via the Power Supply 3333Equipotential Bonding 3333Use Lightning Arrester 4444SFP Port CCCCCCCCCCCConnectionEthernet Port 4444Console Port 4444Verify Installation4444Power On For TL-SG3210 Switch 4444InitializationCCCCCCCCCCCConfiguration Configure the Switch via GUI5555Configure the Switch Using CLI Logon by a Console PortSelect the port to connect in -6, and click OK Logon by Telnet Type cmd in the prompt Run window as -10 and click OK FFFFFFFFFFFFFLog in the Switch AAAAAAAAAAAATroubleshooting Qqqq Why does the Power LED work abnormally?AAAAAAAAAAAAHardware Specifications AAAAAAAAAAAATechnical Support L2 Managed Switch Tel +86 755 Mail support@tp-link.com 7106504453 REV2.0.0