MGC+50/MGC+100 Getting Started Guide
MGC+50 Hardware Installation
Unpacking and Positioning the MGC+50
To unpack and position the MGC+50:
1.When you receive your MGC+50, inspect the equipment for damage and verify that the components match the packing slip. If you did not receive a component or if there is damage to the system, notify Polycom immediately.
Wood Packing Case
Carrying Strap
Lock in Closed Position
Lock in Open Position
Figure 2-3: MGC+50 package
2.Place the MGC+50 unit on a stable flat surface in a location that meets the MGC+50’s environment requirements, which are:
—Operating temperature:
—Humidity:
—Altitude: Up to 3,000m (10,000ft)
—ESD: +8 kV