Compaq Memory Channel Hub manual General, Site Preparation

Page 13

2 Installation

2.1 General

This chapter covers the installation of the 2T-CCMHA-CB central office Memory Channel hub in a 48.26-cm (19-in.) NEBS 2000/ETSI-compliant cabinet with an EIA rail-hole pattern. The major topics covered in this chapter include:

Site Preparation

Unpacking the Shipment

Installing the 2T-CCMHA-CB central office Memory Channel Hub

Determining the Installation Area

Attaching the Slide Assemblies to the Cabinet Rails

Attaching the Inner Races to the Tray

Mounting the Chassis and Front Bezel to the Tray

Installing the Interlock System

For information on configuration and verification, refer to the Memory Channel User’s Guide.

2.2 Site Preparation

The installation instructions that follow assume that:

All cables that you plan to connect to the 2T-CCMHA-CB central office Memory Channel hub are in place and clearly labeled. These cables are the BC12N cables from the CCMAA adapters installed in the AlphaServer systems.

The specifications and conditions listed in Section 1.3 have been met.

DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 2–1

Image 13
Contents Installation/Service Guide December Table of Contents Tables Removal and ReplacementOverview How to Use This GuideIntended Audience OrganizationConventions Related DocumentsReader’s Comments Front Components Components and ControlsIntroduction Operator Control Panel Operator Control PanelRear Components Internal ComponentsEnvironmental Requirements SpecificationsPage Site Preparation GeneralUnpacking the Shipment InstallationMounting Hardware and Component List Determining the Installation Area Installing the 2T-CCMHA-CB Central Office Memory Channel HubInstallation Area Attaching the Slide Assemblies to the Cabinet Rails Attaching the Right Slide Assembly to the Cabinet RailsAttaching the Slide Assemblies to the Cabinet Rails Installation Attaching the Inner Slide Races Attaching the Inner Races to the TrayAchtung LJ-06502A.AI7 Mounting the Chassis and Tray Assembly on the Slides Mounting the Chassis and Tray Assembly on the Slides Installing the Interlock System Achtung Interlock System Introduction Removal and ReplacementRemoval and Replacement Removing and Replacing the Top Cover Top CoverRemoving the Power Supply Power SupplyLJ-06514.AI7