Compaq Memory Channel Hub manual Unpacking the Shipment, Installation

Page 14

Installation

The system is located in an area that provides sufficient clearance for ventilation and servicing. A clearance of 61 cm (24 in.) at the rear and 129.6 cm (51 in.) at the front of the cabinet is required for service.

________________________ Caution ___________________________

Do not impede airflow by obstructing the front and rear of the cabinet.

Exceeding internal thermal limits can affect system reliability.

___________________________________________________________

_______________________ WARNING __________________________

The 2T-CCMHA-CB central office Memory Channel hub can weigh up to

13.6kg (30 lb.). To prevent personal injury and equipment damage, ensure that the system is contained in an enclosure that can be stabilized when the system is pulled out on its slides.

___________________________________________________________

_______________________ ACHTUNG__________________________

Der 2T-CCMHA-CB Central Office Memory Channel Hub kann bis zu 13,6 kg (30 lb) wiegen. Um Personen- und Geräteschaden zu vermeiden, sollten Sie deshalb sicherstellen, daß sich das System in einem Gehäuse befindet, das stabilisiert werden kann, wenn das System an den Schienen herausgezogen wird.

___________________________________________________________

2.3 Unpacking the Shipment

The 2T-CCMHA-CB central office Memory Channel hub shipment may include several cartons. Check the packing list to ensure that all items listed have been received.

If the equipment is damaged or if any items are missing, notify the delivery agent and contact the Compaq sales representative.

Save all shipping cartons in case the equipment needs to be moved to a new location, or needs to be returned for repair.

2–2DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide

Image 14
Contents Installation/Service Guide December Table of Contents Removal and Replacement TablesIntended Audience How to Use This GuideOverview OrganizationReader’s Comments Related DocumentsConventions Components and Controls Front ComponentsIntroduction Operator Control Panel Operator Control PanelInternal Components Rear Components Specifications Environmental RequirementsPage General Site PreparationInstallation Unpacking the ShipmentMounting Hardware and Component List Installing the 2T-CCMHA-CB Central Office Memory Channel Hub Determining the Installation AreaInstallation Area Attaching the Right Slide Assembly to the Cabinet Rails Attaching the Slide Assemblies to the Cabinet RailsAttaching the Slide Assemblies to the Cabinet Rails Installation Attaching the Inner Races to the Tray Attaching the Inner Slide RacesAchtung LJ-06502A.AI7 Mounting the Chassis and Tray Assembly on the Slides Mounting the Chassis and Tray Assembly on the Slides Installing the Interlock System Achtung Interlock System Removal and Replacement IntroductionRemoval and Replacement Top Cover Removing and Replacing the Top CoverPower Supply Removing the Power SupplyLJ-06514.AI7