Compaq Memory Channel Hub manual Achtung

Page 22

Installation

2.4.4Mounting the Memory Channel Hub, Front Bezel, and Interlock Actuator Bracket on the Tray

To mount the 2T-CCMHA-CB central office Memory Channel hub, front bezel, and interlock actuator bracket on the tray, refer to Figure 2-4 and proceed as follows:

_______________________ WARNING __________________________

The 2T-CCMHA-CB central office Memory Channel hub can weigh up to

13.6kg (30 lb.). Use sufficient personnel or the proper lifting equipment when lifting or moving the system.

___________________________________________________________

_______________________ ACHTUNG__________________________

Der 2T-CCMHA-CB Central Office Memory Channel Hub kann bis zu 13,6 kg (30 lb) wiegen. Beim Hochheben oder Transport des Systems sollten deshalb genügend Hilfskräfte vorhanden sein oder die richtigen Hebewerkzeuge benutzt werden.

___________________________________________________________

1.Turn the 2T-CCMHA-CB central office Memory Channel hub upside down on a proper work surface.

2.Turn the tray c(with inner races attached) upside down and place it on bottom cover of the 2T-CCMHA-CB central office Memory Channel hub ö.

3.Align the nine holes in the bottom cover of the 2T-CCMHA-CB central office Memory Channel hub with the nine holes in the tray.

4.Install nine 10-32 truss-head screws õthrough the bottom of the tray into the hub chassis to secure the 2T-CCMHA-CB central office Memory Channel hub to the tray.

5.Turn the front bezel úupside down and place flat washers on the five left most studs on the inside of the bezel. A flat washer is not required on the stud behind the indented label area.

6.Align the six studs on the inside of the bezel with the six holes in the front of the tray and push the bezel onto the tray.

7.Secure the front bezel to the tray with six 8-32 kepnuts ù.

8.Use two 8-32 screws ûto secure the interlock actuator bracket üto the rear of the tray.

2–10DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide

Image 22
Contents Installation/Service Guide December Table of Contents Removal and Replacement TablesIntended Audience How to Use This GuideOverview OrganizationConventions Related DocumentsReader’s Comments Components and Controls Front ComponentsIntroduction Operator Control Panel Operator Control PanelInternal Components Rear ComponentsSpecifications Environmental RequirementsPage General Site PreparationInstallation Unpacking the ShipmentMounting Hardware and Component List Installing the 2T-CCMHA-CB Central Office Memory Channel Hub Determining the Installation AreaInstallation Area Attaching the Right Slide Assembly to the Cabinet Rails Attaching the Slide Assemblies to the Cabinet RailsAttaching the Slide Assemblies to the Cabinet Rails Installation Attaching the Inner Races to the Tray Attaching the Inner Slide RacesAchtung LJ-06502A.AI7 Mounting the Chassis and Tray Assembly on the Slides Mounting the Chassis and Tray Assembly on the Slides Installing the Interlock System Achtung Interlock System Removal and Replacement IntroductionRemoval and Replacement Top Cover Removing and Replacing the Top CoverPower Supply Removing the Power SupplyLJ-06514.AI7