Compaq Memory Channel Hub manual Mounting Hardware and Component List

Page 15

Installation

________________________WARNING __________________________

The 2T-CCMHA-CB central office Memory Channel hub can weigh up to

13.6kg (30 lb.). Use sufficient personnel or the proper lifting equipment when lifting or moving the system.

____________________________________________________________

________________________ACHTUNG __________________________

Der 2T-CCMHA-CB Central Office Memory Channel Hub kann bis zu 13,6 kg (30 lb) wiegen. Beim Hochheben oder Transport des Systems sollten deshalb genügend Hilfskräfte vorhanden sein oder die richtigen Hebewerkzeuge benutzt werden.

____________________________________________________________

Table 2-1 lists the mounting hardware and components included with the 2T-CCMHA-CB central office Memory Channel hub shipment for installation in a 48.26-cm (19-in.) NEBS 2000/ETSI-compliant cabinet with an EIA rail-hole pattern.

Table 2-1 Mounting Hardware and Component List

Description

Part Number

Quantity

Chassis slide assembly

12-46387-01

1 pair

Tray

74- 53806-01

1

Front bezel (gray) or

74-53812-02

1

Front bezel (blue)

74-53812-01

1

Interlock actuator bracket

74-53819-01

1

Stabilizer bracket

74-53822-02

1

Actuator latch

74-48997-03

1

Screw, 10-32 truss-head

90-00063-37

2

Set screw, 6-32

90-06291-10

2

Screw, 8-32 pan-head

90-09545-00

6

Screw, 10-32 truss-head

90-00063-39

23

Standoff, 10-32

90-11510-01

4

Kepnut, 8-32

90-06563-00

6

Flat washer, 8-32

90-06661-00

5

Tie-wraps

90-07031-01

10

DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub

EK-MCHCO-IN

1

Installation/Service Guide

 

 

 

 

 

DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 2–3

Image 15
Contents Installation/Service Guide December Table of Contents Tables Removal and ReplacementOrganization How to Use This GuideOverview Intended AudienceRelated Documents ConventionsReader’s Comments Front Components Components and ControlsIntroduction Operator Control Panel Operator Control PanelRear Components Internal ComponentsEnvironmental Requirements SpecificationsPage Site Preparation GeneralUnpacking the Shipment InstallationMounting Hardware and Component List Determining the Installation Area Installing the 2T-CCMHA-CB Central Office Memory Channel HubInstallation Area Attaching the Slide Assemblies to the Cabinet Rails Attaching the Right Slide Assembly to the Cabinet RailsAttaching the Slide Assemblies to the Cabinet Rails Installation Attaching the Inner Slide Races Attaching the Inner Races to the TrayAchtung LJ-06502A.AI7 Mounting the Chassis and Tray Assembly on the Slides Mounting the Chassis and Tray Assembly on the Slides Installing the Interlock System Achtung Interlock System Introduction Removal and ReplacementRemoval and Replacement Removing and Replacing the Top Cover Top CoverRemoving the Power Supply Power SupplyLJ-06514.AI7