Chapter 1 | ReadyPanel Setup | ||
Preparations |
|
| |
|
|
|
|
| 1) Open shipping box. | • Locate the ReadyPanel Contents List. See Figure |
|
|
| • Unpack the contents of the shipping box. |
|
|
|
|
|
| 2) Verify contents. | • Verify the contents of the shipping box against the Contents List included |
|
|
| with your ReadyPanel shipping box. |
|
|
| • If anything is missing or damaged, call your sales representative. Refer to |
|
|
| the Ampro web site at www.ampro.com for contact information. |
|
|
|
|
|
| 3) Verify support | ReadyPanel User’s Guide |
|
| documentation. | This document describes how to set up and power up the ReadyPanel and is |
|
| (ReadyBoard Support |
| |
| provided on the ReadyBoard Support Software |
| |
| Software |
| |
|
|
| |
| located in the first | ReadyBoard Reference Manual |
|
| QuickStart Kit) | This document provides detailed reference information on the ReadyBoard |
|
|
|
| |
|
| and is located on the ReadyBoard Support Software |
|
|
|
|
|
|
| ReadyBoard QuickStart Guide |
|
|
| This document describes how to set up, install, and power up the ReadyBoard |
|
|
| installed inside the ReadyPanel enclosure and is located on the ReadyBoard |
|
|
| Support Software |
|
|
|
|
|
|
| Operating System Manual(s) |
|
|
| These documents describe how to use the desired operating system (OS) with |
|
|
| the ReadyPanel and provide more detailed programming and operating |
|
|
| information. These documents may or may not be provided with ReadyPanel |
|
|
| depending on the specific licensing requirements. |
|
|
|
|
|
Setting Up the Work Space
| CAUTION | To prevent damage to the ReadyPanel, ensure sufficient clearance exists |
| |
|
| around the air vents for unrestricted airflow. |
| |
|
| The air temperature inside the enclosure could rise above the specified |
| |
|
| operating temperature limits if the airflow through the vents is restricted. |
| |
|
|
|
|
|
|
|
| ||
4) Select workbench |
| • The workbench location should be a flat clean surface for setup and operation | ||
location. |
| (including the connection of any external peripherals and optional devices). | ||
|
|
| • Ensure sufficient airflow clearance exists around the complete enclosure. | |
|
|
| • Make sure to integrate mounting hardware or a method of tilting the Ready- | |
|
|
| Board to one side to allow clearance for the cooling fan. | |
|
|
| ||
5) Unpack ReadyPanel. |
| • Remove the ReadyPanel from its shipping container and place it on a flat work | ||
|
|
| surface. | |
|
|
| The ReadyBoard and the ReadyPanel | |
|
|
|
ReadyPanel | User’s Guide | 3 |