2.Assembly FM Module:
Place FM on “HLD FM” surface(Fig.
Clip FM hook the punch points
Fig. | Touch the | Fig. | |
side surface | |||
|
|
3.Assembly HSG ILL Module:
3.1CM Assembly
I.Insert “Clip CM Side” first, and then place “Clip Front CM” to
II. Assemble Mylar SUB HSG to HSG ILL well (Fig.
III.Assemble CM to HSG ILL and to make CM contact three datum on the HSG ILL Well (Fig.
IV. Assemble” MYLAR CM ” to the CMD firstly, “CLIP TOP CM”(with forceps) to the “HSG ILL” (Fig.
V. To check and make sure “CLIP of CM” hooks the HSG ILL very Well (Fig.
VI. Paste “Sponge tube AL” on cannelure of” HSG ILL” (Fig.
3.2FM Module Assembly
i.FM Module must be placed to fixed shaft and on the datum surface of “ILL SUB” and then lock with screw well (Fig.
Clip CM Side | Fixed shafts | |
of ILL SUB | ||
|
Screw
Fig. | Fig. |