3M 9000PD manual Installing the Wall Bracket, Installation and System Setup 3M Digital WallDisplay

Page 16

Installation and System Setup

3M™ Digital WallDisplay

 

 

Installing the Wall Bracket

Unpacking Wall Bracket and Hardware

1. Place the shipping container face up on the floor.

2. Open the end of the shipping container.

3. Slide the shipping tray partially out the container.

4.Locate and Remove the wall bracket and hardware. The hardware is taped to the wall bracket.

Installation for a Hollow Wall-Drywall

1.Determine the desired location of the unit. Locate all wall studs in area.

2.While holding the bracket in place, use a carpenter’s level to ensure the proper level and then mark the three hole locations on the wall. Ensure that no studs are behind the hole locations.

To Floor

3.Using a Phillips screw driver, screw the supplied anchors into the wall until they are flush with the wall surface.

4.Align the wall bracket holes over the wall anchors and secure with the washer and anchor screws. Confirm that the wall bracket is level before tightening the screws.

Note: For other types of wall material (e.g. wood, concrete, concrete block) use mounting hardware that is properly rated for the weight of the unit and is intended for specific wall material.

16

© 3M 2005. All Rights Reserved.

Image 16
Contents Operator’s Guide This page intentionally left blank for printed version Contents Maintenance TroubleshootingService Information Menu SystemSafety Information IntroductionThank You for Choosing 3M Intended UseIntroduction 3M Digital WallDisplay To reduce the risk associated with hazardous voltageTo reduce the risk associated with muscle strain and impact To reduce the risk associated with chokingTo reduce the risk associated with radio interference To reduce the risk associated with tripping over cablesImportant Notes Product Safety Label TrademarksPatents 3M Digital WallDisplay Technical SupportFCC Statement-Class a EEC Statement-Class aIdentify Model Model Identification and DifferencesModel Differences Optional Accessories ContentsWhat’s Next? Part Identification 3M Digital WallDisplay Features Installation and System Setup Recommendation and Things to Consider Before InstallingLocation of Unit Air VentilationInstalling the Wall Bracket Installation and System Setup 3M Digital WallDisplayInstallation for a Hollow Wall-Drywall Unpacking Wall Bracket and HardwareHanging the 3M Digital WallDisplay Unpacking the 3M Digital WallDisplay3M 2005. All Rights Reserved System Setup Startup OperationOperation 3M Digital WallDisplay Shutdown Features Remote Control UnitRemote Control Unit 3M Digital WallDisplay Forward Keypad Rear Keypad Installing or Replacing Batteries Menu System Menu NavigationColorful-Bright Slider Menu System 3M Digital WallDisplayVolume Slider Warm-Cool SliderMute Menu Function Reset All Menu Input Select MenuBanding Image Adj Sub-MenuMain Returns to main menu Exit Leaves the menu system Tools Sub-Menu Maintenance General MaintenanceLamp Usage Onscreen Lamp MessagesLamp Replacement 5a 5b 3M Digital WallDisplay Resetting Lamp Hours Replacing ProjectionScreen Optical Engine Adjustment 3M Digital WallDisplay Replace the optical adjustment door Troubleshooting Common Problems and SolutionsOnscreen Messages Message MeaningReplacement Parts Service InformationOrdering Parts or Getting Information Appendix 3M Digital WallDisplay SpecificationsAppendix Input/Output Signal Specifications Computer Compatibility3M Austin Center 3M Canada 3M Mexico, S.A. de C.V 3M Europe