Andis Company P333T-PWR quick start Unpack the Device, Equipment

Page 15

Chapter 2: Unpack the Device

!ELECTROSTATIC ALERT:

Wear an anti-static wrist ground strap whenever you handle components of a P333T-PWR Connect the strap to an approved ground, such as an unpainted metal surface.

Equipment

Open the box that contains the P333T-PWR and ensure that it contains the following components and accessories:

One Avaya P333T-PWR Switch.

One Accessory Kit that contains:

One 115V 3 Wire

Power Cable

One RJ45 to RJ45

Flat Cable

Issue 1 September 2005 13

Image 15
Contents Avaya P333T-PWR Stackable Switch Quick Start for Hardware InstallationPage Contents Page Page Nm 860 nm DBm Nm 1360 nm Nm 1570 nm Preparing Contacts you might need Defining the InstallationBefore you Start Gathering InformationPreparing Installation Files Choosing the Installation SitePreparing Needed Tools Environmental Requirements Condition Acceptable values Power RequirementsTip Building a stackC363T-PWR C364T-PWR Stack without C360 Stack with C360 SwitchStack Master election rules C364T-PWR Page Equipment Unpack the DeviceDocumentation Avaya P330 Documentation and Utilities CD Page Closed hinged end Mount the DeviceOpen hinged end AC input Power UpP333R DC version rear panel DC input optionalEstablishing a Console Connection Prepare for ConfigurationAssigning a Stack IP Address Establishing a Telnet Connection Configuring the SwitchBasic configuration Avaya P333R Default SettingsAssigning the Stack IP Address Default Switch Settings Function Default Setting Default Port Settings Parameter Default Setting Device Manager OverviewSystem Requirements Running the Device Manager Configuring the Device ManagerDevice Manager Commands Order to Use the following commandWelcome Installing from the P330 Documentation and Utilities CD Installing the Java Plug-inInstall from your Local Web Site Install from the Avaya Web SiteDocumentation