Installing the Hub continued
Installation  | 5 Secure the hub with the screws removed in Step 3. | 
procedure,  | 6 Using  | 
continued  | tion ports (1X – 4X , in any order) to each worksta- | 
  | tion’s  | 
  | be connected in cascade.(See Figure 2 on page 4.) | 
  | 7 Connect the Uplink port, if applicable: | 
  | • If connecting to another hub: | 
  | – Use a  | 
  | tion port. (See Figure 2 on page 4.) | 
  | – Use a crossover cable to connect to the Uplink | 
  | port. (See Figure 4 on page 10.) | 
  | • If connecting the Uplink port to a workstation or  | 
  | other  | 
  | – Use a crossover cable. (See Figure 2 on page 4.) | 
  | 8 Turn on the UPS or device that now houses the hub. | 
  | To turn on the UPS or device, follow the appropriate | 
  | procedure listed below: | 
  | 
 | 
  | a Plug the UPS back into the AC power outlet. | 
  | b Press and hold the Power On button until you | 
  | hear a click and beep or until the power LED | 
  | illuminates. | 
  | c Power on the connected equipment. | 
  | 
 | 
  | a Turn on the circuit breaker on the bottom left | 
  | side on the back panel of the UPS. | 
  | b Turn on the UPS via the front panel. | 
  | c Power on the connected equipment.  | 
  | 
  | 
  | Continued on next page  | 
8