American Power Conversion AP9615 Secure the hub with the screws removed in Step, Port. See on

Page 12

Installing the Hub continued

Installation

5 Secure the hub with the screws removed in Step 3.

procedure,

6 Using straight-through UTP cables, connect the Sta-

continued

tion ports (1X – 4X , in any order) to each worksta-

 

tion’s 10Base-Tport or to the Uplink port of a hub to

 

be connected in cascade.(See Figure 2 on page 4.)

 

7 Connect the Uplink port, if applicable:

 

If connecting to another hub:

 

– Use a straight-through cable to connect to a Sta-

 

tion port. (See Figure 2 on page 4.)

 

– Use a crossover cable to connect to the Uplink

 

port. (See Figure 4 on page 10.)

 

If connecting the Uplink port to a workstation or

 

other non-hub device:

 

– Use a crossover cable. (See Figure 2 on page 4.)

 

8 Turn on the UPS or device that now houses the hub.

 

To turn on the UPS or device, follow the appropriate

 

procedure listed below:

 

Smart-UPS

 

a Plug the UPS back into the AC power outlet.

 

b Press and hold the Power On button until you

 

hear a click and beep or until the power LED

 

illuminates.

 

c Power on the connected equipment.

 

Matrix-UPS

 

a Turn on the circuit breaker on the bottom left

 

side on the back panel of the UPS.

 

b Turn on the UPS via the front panel.

 

c Power on the connected equipment.

 

 

 

Continued on next page

8

Image 12
Contents Port 10Base-T Hub Thank You Contents Page SmartSlot 5-Port 10Base-T Hub is an APC accessory LAN by installing it in the SmartSlot of an APC UPS orIntroduction That allows you to expand or create a local area networkProduct Description For a description of the conditions indicated by LEDs Label Color Activity DescriptionWays, as shown in Figure Munication cable for each device to be attachedInstalling the Hub Shut down and power off the connected Turn off the System Enable switch onTurn off the ON/OFF switch on the front If present, unplug the Triple Chassis’s powerUse a #2 Phillips head screwdriver to remove Screws fastening the SmartSlot cover plate toBack panel of the UPS or triple chassis. Keep Screws for below. Save the SmartSlot coverUsing straight-through UTP cables, connect the Sta Procedure listed belowPlug the UPS back into the AC power outlet Press and hold the Power On button until youInstallation Procedure As many as 32 stations, as shown below in . Note Use of a crossover cable to connect the Uplink ports2 central hubs Removing the Hub Troubleshooting Provides suggestions for troubleshooting your hubAction Cause Solution Troubleshooting Suggestions Specifications Port 10Base-T HubWarranty Information Procedure Be prepared to provide a description of the problemTechnician will help solve the problem over Authorization RMA numberApplication of Council Directives Standards to WhichConformity is DeclaredW. a p c c . c o m