American Power Conversion AP9615 manual Installing the Hub

Page 9

Installing the Hub

Warning

Do not operate the 5 Port 10Base-T Hub where conditions

 

are outside the limits listed in “Product Specifications” on

 

page 14.

 

 

Installing on

The installation procedure that follows may involve shut-

critical systems

ting off power from the UPS. However, if your setup

 

requires maintaining power to connected equipment

 

throughout installation, visit the support page on our Web-

 

site

 

(http://www.apcc.com/support/#kbase) and follow the

 

appropriate procedure in Installation Instructions for APC

 

Management Accessories on Critical Systems.

 

 

Installation

To install the 5 Port 10Base-T Hub, perform the following

procedure

steps in the order given.

 

Note: The Smart-UPS, Matrix-UPS, Symetra Power Array,

 

Smart-UPS DP, and Triple Chassis for Silcon require

 

different procedures to turn off the UPS or device that

 

will host the hub.

 

1 To turn off the UPS or device that will host the hub,

 

follow the appropriate procedure listed below:

 

Smart-UPS®

 

a Shut down and power off the connected equip-

 

ment.

 

b Press and hold the UPS’s Power Off button

 

until you hear a click or until the UPS’s power

 

LED extinguishes.

 

c Unplug the UPS from the AC power outlet.

 

d Press and hold the UPS’s Power Off button

 

until you hear a click (hold for at least 5 sec-

 

onds).

 

 

 

Continued on next page

5

Image 9
Contents Port 10Base-T Hub Thank You Contents Page LAN by installing it in the SmartSlot of an APC UPS or SmartSlot 5-Port 10Base-T Hub is an APC accessoryIntroduction That allows you to expand or create a local area networkProduct Description Label Color Activity Description For a description of the conditions indicated by LEDsMunication cable for each device to be attached Ways, as shown in FigureInstalling the Hub Turn off the System Enable switch on Shut down and power off the connectedTurn off the ON/OFF switch on the front If present, unplug the Triple Chassis’s powerScrews fastening the SmartSlot cover plate to Use a #2 Phillips head screwdriver to removeBack panel of the UPS or triple chassis. Keep Screws for below. Save the SmartSlot coverProcedure listed below Using straight-through UTP cables, connect the StaPlug the UPS back into the AC power outlet Press and hold the Power On button until youInstallation Procedure As many as 32 stations, as shown below in . Note Use of a crossover cable to connect the Uplink ports2 central hubs Removing the Hub Troubleshooting Provides suggestions for troubleshooting your hubAction Cause Solution Troubleshooting Suggestions Port 10Base-T Hub SpecificationsWarranty Information Be prepared to provide a description of the problem ProcedureTechnician will help solve the problem over Authorization RMA numberDirectives Standards to Which Application of CouncilConformity is DeclaredW. a p c c . c o m