American Power Conversion AP9615 manual Removing the Hub

Page 15

Removing the Hub

Removal

To remove the 5 Port 10Base-T Hub, perform the following

procedure

steps in the order given.

 

1

Disconnect all cables from the hub.

 

2

Turn off the UPS or device that houses the hub. (For

 

 

detailed instructions, see “Installation procedure” on

 

 

page 5.)

 

3

Use a #2 Phillips head screwdriver to remove the 2

 

 

screws fastening the hub to the UPS or triple chassis.

 

 

Keep the screws for Step 6 below.

 

4

Carefully grasp the sides of the hub’s front panel and

 

 

gently pull the hub from the SmartSlot.

 

 

Handle the 5 Port 10Base-T Hub by the front

 

 

panel. Do not touch the exposed printed cir-

 

 

cuit board or components. Touching the

 

 

circuit board or components may result in

 

 

damage to the hub.

 

5

Place the hub into its original packaging or other

 

 

static-safe material.

 

6

Replace the SmartSlot coverplate (removed during

 

 

installation of the hub) with the screws removed in

 

 

Step 3.

 

 

 

11

Image 15
Contents Port 10Base-T Hub Thank You Contents Page That allows you to expand or create a local area network SmartSlot 5-Port 10Base-T Hub is an APC accessoryLAN by installing it in the SmartSlot of an APC UPS or IntroductionProduct Description Label Color Activity Description For a description of the conditions indicated by LEDsMunication cable for each device to be attached Ways, as shown in FigureInstalling the Hub If present, unplug the Triple Chassis’s power Shut down and power off the connectedTurn off the System Enable switch on Turn off the ON/OFF switch on the frontScrews for below. Save the SmartSlot cover Use a #2 Phillips head screwdriver to removeScrews fastening the SmartSlot cover plate to Back panel of the UPS or triple chassis. KeepPress and hold the Power On button until you Using straight-through UTP cables, connect the StaProcedure listed below Plug the UPS back into the AC power outletInstallation Procedure As many as 32 stations, as shown below in . Note Use of a crossover cable to connect the Uplink ports2 central hubs Removing the Hub Troubleshooting Provides suggestions for troubleshooting your hubAction Cause Solution Troubleshooting Suggestions Port 10Base-T Hub SpecificationsWarranty Information Authorization RMA number ProcedureBe prepared to provide a description of the problem Technician will help solve the problem overDeclared Application of CouncilDirectives Standards to Which Conformity isW. a p c c . c o m