American Power Conversion AP9615 manual Procedure, Surface of the hub’s front panel, Ble

Page 20

Warranty Information continued

Obtaining

To obtain service for your 5 Port 10Base-T Hub, follow this

service

procedure:

 

1

Note the serial number and date of purchase of the

 

 

hub. (The serial number is located on the top, interior

 

 

surface of the hub’s front panel.)

 

2

Contact APC Customer Support at the phone number

 

 

or address on the back cover of this manual.

 

3

Be prepared to provide a description of the problem.

 

 

A technician will help solve the problem over the

 

 

phone, if possible, or will give you a return material

 

 

authorization (RMA) number.

 

4

If the hub is under warranty, repair or replacement is

 

 

free of charge. If the warranty has expired, there will

 

 

be a nominal charge for repair or replacement.

 

5

Pack the hub carefully in its original packaging, if

 

 

possible. Do not use polystyrene beads for packing.

 

 

Damage sustained in transit is not covered under the

 

 

warranty. Enclose a letter in the package with your

 

 

name, address, RMA number, a copy of the sales

 

 

receipt, daytime phone number, and check (if applica-

 

 

ble).

 

6

Mark the RMA number clearly on the outside of the

 

 

shipping carton. The service center will not accept

 

 

any materials without this marking.

 

7

Return the hub by insured, prepaid carrier to the

 

 

address given to you by APC Customer Support.

16

Image 20
Contents Port 10Base-T Hub Thank You Contents Page SmartSlot 5-Port 10Base-T Hub is an APC accessory LAN by installing it in the SmartSlot of an APC UPS orIntroduction That allows you to expand or create a local area networkProduct Description For a description of the conditions indicated by LEDs Label Color Activity DescriptionWays, as shown in Figure Munication cable for each device to be attachedInstalling the Hub Shut down and power off the connected Turn off the System Enable switch onTurn off the ON/OFF switch on the front If present, unplug the Triple Chassis’s powerUse a #2 Phillips head screwdriver to remove Screws fastening the SmartSlot cover plate toBack panel of the UPS or triple chassis. Keep Screws for below. Save the SmartSlot coverUsing straight-through UTP cables, connect the Sta Procedure listed belowPlug the UPS back into the AC power outlet Press and hold the Power On button until youInstallation Procedure 2 central hubs As many as 32 stations, as shown below in . NoteUse of a crossover cable to connect the Uplink ports Removing the Hub Action Cause Solution TroubleshootingProvides suggestions for troubleshooting your hub Troubleshooting Suggestions Specifications Port 10Base-T HubWarranty Information Procedure Be prepared to provide a description of the problemTechnician will help solve the problem over Authorization RMA numberApplication of Council Directives Standards to WhichConformity is DeclaredW. a p c c . c o m