3Com 5017C-LS, 5017C with load sharing Installing ONline Modules, Connecting Network Cables

Page 49

Warning: DO NOT use a 3-to-2 pronged adapter at the outlet since this may result in electrical shock and does not provide adequate grounding.

Installing ONline Modules

Warning: Only service personnel should install ONline modules.

Install the ONline Controller Module in the concentrator as described in the ONline Controller Module Installation Guide provided with the Controller Module.

Install any ONline media modules in the ONline System Concentrator as described in the manual provided with each module. Note that you do not need to turn off the concentrator when installing additional modules to your concentrator.

Use the chart in Appendix B to label the location of each module in the concentrator. At least one media module must be installed along with the Controller Module to make the concentrator functional.

Connecting Network Cables

Connect the network cables between concentrators, patch panels, and transceivers.

Installation and Troubleshooting 2 - 19

Image 49
Contents Document Number Printed March VDE Class B Compliance Restricted Rights Page Contents Maintenance Appendix B Slot Usage Chart Appendix C Technical Support Page Figures Page Tables Page Audience How to Use This GuideThis guide contains the following chapters Structure of This GuideConvention Indicates Example Document ConventionsRelated Documents Reference Documents 3Com DocumentsPage Introducing the ONline System Concentrator IntroductionMultiple 17-Slot Concentrator Environment Front Panel Back PanelONline System Concentrator Front View ONline System Concentrator FeaturesModular Design Modular ONline ConfigurationTriChannel Architecture Port-Switching TechnologyONline System Concentrator Using Multiple Networks Backup Power Supply Fault-Tolerance CapabilitiesLoad Sharing Redundant Cable Links Backup Controller ModuleRedundant Cable Link Configuration Backup ConcentratorHot Swapping of Media Modules Backup Concentrator ConfigurationSynchronous Backplane Contents of the Shipping Box Installation and TroubleshootingONline System Concentrator Shipping Box Contents FCC Regulations Location Requirements Site Selection ConsiderationsVentilation Rack Mount Installation Requirements Power RequirementsTable Top Installation Requirements InstallationInstalling the Cable Tray Cable Tray Rack Mounting Rack Mount SettingsRack Mount Positions Cable Tray Table Mounting Cable Tray Installation in RackRack Mounting the ONline System Concentrator Installing the ONline System ConcentratorAttaching the Rack Mount Flanges Chassis Mounted in Rack Table Top Mounting the ONline ConcentratorRemoving Fan Unit Installing the Backup Power Supply OptionalUnplugging the Fan Unit Power Supply Connectors 10. Installed Backup Power Supply Selecting the Power Supply Voltage11. Setting the Voltage Selector Switch Connecting Network Cables Installing ONline Modules12. Network Cable Connections Power Up and VerificationFan Operation Verification Power Supply Operation VerificationTroubleshooting with Controller Module LEDs Command. If this fails to See Primary Power LED Technical Assistance Configuration of your concentrator Where To Go From HereMaintenance Replacing the Power Supply Routine MaintenanceRemoving the Power Supply Unplugging the Power Supply Power Supply Plugs in ONline System Concentrator Backup Power Supply Installed Removing the Fan Unit Replacing the Fan UnitUnplugging the Fan Unit Other System Components ONline Module MaintenancePage Environmental GeneralMechanical Power SourceRegulatory Compliance Accessories Page Slot Usage Chart Table B-1. Concentrator Slot Usage Chart Table B-1. Concentrator Slot Usage Chart Page On-line Technical Support Technical SupportEmail Technical Support Support from Your Network SupplierWorld Wide Web Site Support from 3Com Returning Products for Repair Accessing the 3Com MIB3Com Technical Publications Page Index Index