3Com 5017C-LS, 5017C with load sharing Unplugging the Power Supply

Page 60

Figure 3-2. Unplugging the Power Supply

Note: Before you install the new power supply, check the label on the inside of the power supply bay that explains where each of the seven power leads from the power supply are connected in the concentrator chassis.

Power leads labeled P7, P8, and P9 fit in the back three raised connectors and they are “keyed” so they can be inserted only in the correct connector and only in one direction. Power leads labeled P10, P11, P12, and P13 fit in the front four recessed connectors and can be inserted in only one direction.

4.Pick up the new power supply and plug in the seven (7) power leads from the power supply as shown in Figure 3-3.

3 - 4 ONline 17-Slot System Concentrator Installation and Operation Guide

Image 60
Contents Document Number Printed March VDE Class B Compliance Restricted Rights Page Contents Maintenance Appendix B Slot Usage Chart Appendix C Technical Support Page Figures Page Tables Page How to Use This Guide AudienceStructure of This Guide This guide contains the following chaptersDocument Conventions Convention Indicates ExampleRelated Documents 3Com Documents Reference DocumentsPage Introduction Introducing the ONline System ConcentratorMultiple 17-Slot Concentrator Environment Back Panel Front PanelONline System Concentrator Features ONline System Concentrator Front ViewModular ONline Configuration Modular DesignPort-Switching Technology TriChannel ArchitectureONline System Concentrator Using Multiple Networks Fault-Tolerance Capabilities Backup Power SupplyLoad Sharing Backup Controller Module Redundant Cable LinksBackup Concentrator Redundant Cable Link ConfigurationBackup Concentrator Configuration Hot Swapping of Media ModulesSynchronous Backplane Installation and Troubleshooting Contents of the Shipping BoxONline System Concentrator Shipping Box Contents FCC Regulations Site Selection Considerations Location RequirementsVentilation Power Requirements Rack Mount Installation RequirementsInstallation Table Top Installation RequirementsInstalling the Cable Tray Rack Mount Settings Cable Tray Rack MountingRack Mount Positions Cable Tray Installation in Rack Cable Tray Table MountingInstalling the ONline System Concentrator Rack Mounting the ONline System ConcentratorAttaching the Rack Mount Flanges Table Top Mounting the ONline Concentrator Chassis Mounted in RackInstalling the Backup Power Supply Optional Removing Fan UnitUnplugging the Fan Unit Power Supply Connectors Selecting the Power Supply Voltage 10. Installed Backup Power Supply11. Setting the Voltage Selector Switch Installing ONline Modules Connecting Network CablesPower Up and Verification 12. Network Cable ConnectionsPower Supply Operation Verification Fan Operation VerificationTroubleshooting with Controller Module LEDs Command. If this fails to See Primary Power LED Technical Assistance Where To Go From Here Configuration of your concentratorMaintenance Routine Maintenance Replacing the Power SupplyRemoving the Power Supply Unplugging the Power Supply Power Supply Plugs in ONline System Concentrator Backup Power Supply Installed Replacing the Fan Unit Removing the Fan UnitUnplugging the Fan Unit ONline Module Maintenance Other System ComponentsPage General EnvironmentalPower Source MechanicalRegulatory Compliance Accessories Page Slot Usage Chart Table B-1. Concentrator Slot Usage Chart Table B-1. Concentrator Slot Usage Chart Page Technical Support On-line Technical SupportSupport from Your Network Supplier Email Technical SupportWorld Wide Web Site Support from 3Com Accessing the 3Com MIB Returning Products for Repair3Com Technical Publications Page Index Index