3Com 5017C-LS, 5017C with load sharing Cable Tray Table Mounting, Cable Tray Installation in Rack

Page 40

Note: The function of the clip is to hold the nut in place behind the rail. Be sure to install the clip onto the rail so that the nut is centered behind the hole through which you plan to insert the screw.

4.Place the tray in the rack and attach to the clip nuts through the front of the rack using the four (4) 10-32 x 5/8" truss-head screws and as shown in Figure 2-3.

Figure 2-3. Cable Tray Installation in Rack

Cable Tray Table Mounting

To install the concentrator on a table top or on a shelf, place the cable tray on the surface first and then place the concentrator on top of the tray. Note that the four rubber feet must be installed on the concentrator before it is placed on the table top or on top of the cable tray. The feet fit into the four holes in the cable tray, which prevents the concentrator from moving.

2 - 10 ONline 17-Slot System Concentrator Installation and Operation Guide

Image 40
Contents Document Number Printed March VDE Class B Compliance Restricted Rights Page Contents Maintenance Appendix B Slot Usage Chart Appendix C Technical Support Page Figures Page Tables Page How to Use This Guide AudienceStructure of This Guide This guide contains the following chaptersDocument Conventions Convention Indicates ExampleRelated Documents 3Com Documents Reference DocumentsPage Introduction Introducing the ONline System ConcentratorMultiple 17-Slot Concentrator Environment Back Panel Front PanelONline System Concentrator Features ONline System Concentrator Front ViewModular ONline Configuration Modular DesignPort-Switching Technology TriChannel ArchitectureONline System Concentrator Using Multiple Networks Backup Power Supply Fault-Tolerance CapabilitiesLoad Sharing Backup Controller Module Redundant Cable LinksBackup Concentrator Redundant Cable Link ConfigurationBackup Concentrator Configuration Hot Swapping of Media ModulesSynchronous Backplane Installation and Troubleshooting Contents of the Shipping BoxONline System Concentrator Shipping Box Contents FCC Regulations Location Requirements Site Selection ConsiderationsVentilation Power Requirements Rack Mount Installation RequirementsInstallation Table Top Installation RequirementsInstalling the Cable Tray Rack Mount Settings Cable Tray Rack MountingRack Mount Positions Cable Tray Installation in Rack Cable Tray Table MountingInstalling the ONline System Concentrator Rack Mounting the ONline System ConcentratorAttaching the Rack Mount Flanges Table Top Mounting the ONline Concentrator Chassis Mounted in RackInstalling the Backup Power Supply Optional Removing Fan UnitUnplugging the Fan Unit Power Supply Connectors Selecting the Power Supply Voltage 10. Installed Backup Power Supply11. Setting the Voltage Selector Switch Installing ONline Modules Connecting Network CablesPower Up and Verification 12. Network Cable ConnectionsPower Supply Operation Verification Fan Operation VerificationTroubleshooting with Controller Module LEDs Command. If this fails to See Primary Power LED Technical Assistance Where To Go From Here Configuration of your concentratorMaintenance Routine Maintenance Replacing the Power SupplyRemoving the Power Supply Unplugging the Power Supply Power Supply Plugs in ONline System Concentrator Backup Power Supply Installed Replacing the Fan Unit Removing the Fan UnitUnplugging the Fan Unit ONline Module Maintenance Other System ComponentsPage General EnvironmentalMechanical Power SourceRegulatory Compliance Accessories Page Slot Usage Chart Table B-1. Concentrator Slot Usage Chart Table B-1. Concentrator Slot Usage Chart Page Technical Support On-line Technical SupportEmail Technical Support Support from Your Network SupplierWorld Wide Web Site Support from 3Com Accessing the 3Com MIB Returning Products for Repair3Com Technical Publications Page Index Index