Seagate ST19171WC, ST19171DC, ST19171N, ST19171WD manual Od Dc

Page 19

Barracuda 9 Installation Guide, Rev. B

 

 

17

DC power requirements

 

 

 

 

 

Single-ended

Differential

 

+5V11

+12V

+5V11

+12V

Voltage regulation5

± 5%

± 5%2

± 5%

± 5%2

 

 

Amps

 

Maximum operating current1

0.93

0.89

1.17

0.89

Maximum starting current

 

 

 

 

Peak DC 3, 6

0.92

2.18

1.04

2.18

Peak AC 3

3.1

3.1

Delayed motor start (max)1, 4

0.82

0.08

0.90

0.08

Peak operating current

 

 

 

 

Typical DC 1

0.92

0.84

1.12

0.84

Maximum DC 1

0.93

0.89

1.17

0.89

Maximum (peak)

1.00

1.8

1.89

1.8

Track following (DC)

 

 

 

 

at OD 1

0.84

0.73

0.96

0.73

at ID 1

0.83

0.76

0.94

0.76

Read track

 

 

 

 

OD DC 1

0.96

0.78

1.49

0.78

AC

1.10

0.97

1.99

0.97

Seeking

 

 

 

 

Typical DC 1, 13

0.91

1.06

0.99

1.06

Maximum DC 1

0.92

1.1

1.05

1.1

Maximum (peak) AC

0.96

1.8

1.77

1.8

1Measured with an average reading DC ammeter. Instanta- neous +12V current peaks will exceed these values.

Image 19
Contents ST19171N/W/WD/WC/DC Contents Electrostatic discharge protection PrefaceImportant safety information and precautions Page Wichtige Sicherheitshinweise Barracuda 9 Installation Guide, Rev. B Barracuda 9 Installation Guide, Rev. B Page Electromagnetic susceptibility Regulatory agency complianceElectromagnetic compliance for the European Union Online services Seagate technical support servicesSeagate CompuServe forum SeaFAX FAX servicesSeagate technical support Direct-support servicesManufacturer’s representatives Customer service centersGeneral description Characteristics ST19171 OD DC Barracuda 9 Installation Guide, Rev. B Page General information Drive modelsDrive termination Scsi ID jumpersScsi bus termination Circuits and data path widths Terminator powerProviding adequate cooling Barracuda 9 Installation Guide, Rev. B Kühlung des Systems Suggested air flow Abbildung 3. Empfohlener Luftstromverlauf Installation des Laufwerkes und Anschluß der Kabel Mounting the drive and connecting cablesBarracuda 9 Installation Guide, Rev. B DC power connector Abbildung 4. Gleichstromanschluß Hinweis Quick reference desktop system notes Formatting the driveDrives Setting the Scsi ID jumpersTerminating the drive Terminating the driveSetting terminator power jumpers Several other jumper options are available as illustrated Other applicable jumper optionsWD drives Using the J1 auxiliary jumper block Terminating the drive ST19171W shown ST19171W Other option jumpers are available as illustrated below WC/DC drives Option jumpers are available as illustrated below Applicable jumper optionsPage Page