GE ZBTSD manual Accessory Group Packages, Stds Exes Cons Sens Spes Psgs

Page 11

Accessory Group Packages

Table 3

Accessories

 

 

Group Packages

 

 

STDS

EXES

CONS

SENS

SPES

PSGS

 

6P

 

 

 

 

 

 

A1

 

 

 

 

 

 

A1E

 

 

 

 

 

 

A3

 

2

2

2

2

3

A4

 

2

2

2

2

3

Calibrate

 

 

 

 

 

 

CDT

 

 

 

 

 

 

CDP

 

 

 

 

 

 

**DS

 

 

 

 

 

 

*DT

 

 

 

 

 

 

*DW

 

 

 

 

 

 

E

 

 

 

 

 

 

EL/P

 

 

 

 

 

 

K/P

 

 

 

 

 

 

L1

 

 

 

 

 

 

L2

 

 

 

 

 

 

L3

 

 

 

 

 

 

L4

 

 

 

 

 

 

*LN

 

 

 

 

 

 

P1

 

 

 

 

 

 

Q2

 

 

 

 

 

 

Q3

 

 

 

 

 

 

Q7

 

 

 

 

 

 

R1-1

 

 

 

 

 

 

R1-3

 

 

 

 

 

 

R15

 

 

 

 

 

 

*R15D

 

 

 

 

 

 

R16

 

 

 

 

 

 

R50

 

 

 

 

 

 

S5P

 

 

 

 

 

 

S12P

 

 

 

 

 

 

S13P

 

 

 

 

 

 

T

 

 

 

 

 

 

T3/W3

2

2

2

2

2

2

U

 

 

 

 

 

 

UMD

2

2

2

2

2

2

VI

 

 

 

 

 

 

W

YEN

22

3

Standard Accessory included in the group package.

Optional Accessory not included but can be added to group package. Optional Accessory. Can not be used with accessory having the same symbol. N/A

Denotes an Accessory with 2 circuits as a standard. Denotes an Accessory with 3 circuits as a standard.

*Delayed Transition Units Only.

**Optional for 40-400 Amp

GE Zenith Controls

ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

9

Image 11 Contents
GE Zenith Controls Introduction Authorized ServiceTable of Contents Mounting SafetyEquipment Inspection and Storage Final Equipment InspectionEngine Start Control Connections InstallationPower Connections IInitial Energization Installation cont’dR E T E S T Initial Energization cont’dInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerLCD & Keypad Entelli-Switch 250 Controller cont’dStandard 3-Phase Sensing on 3 and 4 Pole Units Source User Setting for Voltage & FrequencyStds Exes Cons Sens Spes Psgs Accessory Group PackagesCalibrate Accessory DefinitionsA62 Accessory Definitions cont’d S14 R50S12P S13PUMD How to Set the System ClockLoad / No-Load CDT One Event Timer ExerciserLoad / No-Load Clock Exerciser CDP Clock ExerciserTurn options on or OFF via keypad through the CFG menu Entelli-Switch 250 User Setup CFG MenuChange adjustable values through the SET menu Entelli-Switch 250 User Setup SET MenuView System Data Entelli-Switch 250 User Setup System InfoStandard Transition TestingATS Testing Delayed TransitionSequence of Operation Timer Designations as they appear in the SET menuBypass-Isolation Operation Sequence of Operation cont’dAutomatic 100-400 AMP600-1200 AMP 1600-4000 AMP Standard and Delay Transition Controls Power Supply CPSDelayed Transition CPS Schematic Controls Power Supply CPS cont’dStandard Transition CPS Schematic General Troubleshooting Troubleshooting and DiagnosticsServicing Maintenance and TestingInspection and Cleaning TestingPage GE Zenith Controls