GE ZBTSD manual Sequence of Operation, Timer Designations as they appear in the SET menu

Page 22

Sequence of Operation

Standard Transition

Source 1 Power Failure:

When Source 1 voltage or frequency has fallen below the preset "Fail" values, the controller initiates the Time Delay Source 2 Start Timer (Engine Start Timer "P") cycle. Upon completion of the (P) time delay, an Engine start Signal is sent to Source 2. When Source 2 voltage and frequency reach the preset "Restore" Values, the time delay to Source 2 Timer (W) begins its timing cycle to ensure voltage and frequency stabilization before transfer. A manual pushbutton BYPASS is provid- ed to bypass the "W" time delay if desired. After the (W) time delay, the MX controller initiates a transfer signal through the SCR-E to operate the main transfer opera- tor. The load is now transferred to Source 2 line. The transfer switch is mechanically locked. SN limit switch awaits the next operation to Source 1.

Restoration of Source 1 Power:

When Source 1 power reach the preset "Restore" values, the controller initiates re-transfer to Source 1sequence.The delay to Source 1 Timer (T) begins its timing cycle to ensure voltage and frequency stabiliza- tion before retransfer. A manual pushbutton BYPASS is provided to bypass the "T" time delay if desired. After the (T) time delay, the MX controller initiates a transfer signal through the SCR-N to operate the main transfer operator. The load is now transferred to Source 1 line. The transfer switch is mechanically locked. SE limit switch awaits the next operation to Source 2.

Immediately after re-transfer, the S2 Stop Delay Timer (Delay to Engine Stop "U") begins its cycle to allow Source 2 Engine to run unloaded. A manual pushbut- ton BYPASS is provided to bypass the "U" time delay if desired. Upon completion of the (U) timing cycle, the controller sends an Engine stop signal.

Delayed Transition

Source 1 Power Failure:

When Source 1 voltage or frequency has fallen below the preset "Fail" values, the controller initiates the Time Delay Source 2 Start (Engine Start Timer "P") cycle. Upon completion of the (P) time delay, an Engine start Signal is sent to Source 2. When Source 2 voltage and frequency reach the preset "Restore" values, the time delay to open Source 1 timer (W) begins its timing cycle to ensure voltage and frequency stabilization before re-transfer. A manual pushbutton BYPASS is provided to bypass the "W" time delay if desired. After the (W) time delay, the MX controller initiates a transfer signal through the SCR-NO to operate the main transfer operator. The load is now transferred to the Open position. The time delay to Source 2 timer (DW) begins its timing cycle. After the (DW) time delay, the MX controller initiates a transfer signal through the SCR-E to operate the main transfer operator. The load is now transferred to Source 2 line. The transfer switch is mechanically locked. SN limit switch awaits the next operation to Source 1.

Restoration of Source 1 Power:

When Source 1 power reach the preset "Restore" values, the controller initiates re-transfer to Source 1 sequence. The delay to open Source 2 Timer (T) begins its timing cycle to ensure voltage and frequency stabilization before retransfer. A manual pushbutton BYPASS is pro- vided to bypass the "T" time delay if desired. After the

(T)time delay, the MX controller initiates a transfer sig- nal through the SCR-EO to operate the main transfer operator. The load is now transferred to the Open position. The time delay to Source 1 timer (DT) begins its timing cycle. After the (DT) time delay, the MX controller initiates a transfer signal through the SCR-N to operate the main transfer operator. The load is now transferred to Source 1 line. The transfer switch is mechanically locked. SE limit switch awaits the next operation to Source 2.

Immediately after re-transfer, the S2 Stop Delay Timer (Delay to Engine Stop "U") begins its cycle to allow Source 2 Engine to run unloaded. A manual pushbut- ton BYPASS is provided to bypass the "U" time delay if desired. Upon completion of the (U) timing cycle, the controller sends an Engine stop signal.

Table 4

Timer Designations as they appear in the SET menu

ATS Type

P

 

W

 

DW

 

T

 

 

DT

U

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Standard

Time Delay

Time Delay

 

 

 

Time Delay

 

 

 

 

S2 Stop

Transition

S2 Start

 

S2 Stable

 

 

 

S1 Stable

 

 

 

 

Delay

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Delayed

Time Delay

Time Delay

 

ATS Open

Time Delay

 

ATS Open

S2 Stop

Transition

S2 Start

 

S2 Stable

 

Time to S2

S1 Stable

 

Time to S1

Delay

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Source 1

Transfer to Source 2

 

Source 1

Transfer to Source 1

Engine

Fails

 

 

 

 

 

 

 

 

 

 

 

 

Cooldown

 

 

 

 

 

 

Returns

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20

ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

GE Zenith Controls

 

Image 22 Contents
GE Zenith Controls Table of Contents Authorized ServiceIntroduction Final Equipment Inspection SafetyEquipment Inspection and Storage MountingPower Connections InstallationEngine Start Control Connections Installation cont’d IInitial EnergizationInitial Energization cont’d R E T E S TInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerEntelli-Switch 250 Controller cont’d LCD & KeypadUser Setting for Voltage & Frequency Standard 3-Phase Sensing on 3 and 4 Pole Units SourceAccessory Group Packages Stds Exes Cons Sens Spes PsgsA62 Accessory DefinitionsCalibrate Accessory Definitions cont’d S13P R50S12P S14How to Set the System Clock UMDCDT One Event Timer Exerciser Load / No-LoadCDP Clock Exerciser Load / No-Load Clock ExerciserEntelli-Switch 250 User Setup CFG Menu Turn options on or OFF via keypad through the CFG menuEntelli-Switch 250 User Setup SET Menu Change adjustable values through the SET menuEntelli-Switch 250 User Setup System Info View System DataDelayed Transition TestingATS Testing Standard TransitionTimer Designations as they appear in the SET menu Sequence of OperationSequence of Operation cont’d Bypass-Isolation Operation100-400 AMP Automatic600-1200 AMP 1600-4000 AMP Controls Power Supply CPS Standard and Delay TransitionStandard Transition CPS Schematic Controls Power Supply CPS cont’dDelayed Transition CPS Schematic Troubleshooting and Diagnostics General TroubleshootingTesting Maintenance and TestingInspection and Cleaning ServicingPage GE Zenith Controls