Controls Power Supply (CPS)

Standard and Delay Transition

Each Entelli-Switch 250 microprocessor based ATS controller requires Controls Power Supply (CPS) to apply line voltage to the ATS operator via SCRs. Also required is power for the Entelli-Switch 250 printed circuit board and an application of sensing voltage proportional to line

voltage. This is accomplished by the Controls Power Supply (CPS). This method of switching operator voltage and applying power and sensing voltage to the printed circuit board isolates the MX250 from the line voltage, further protecting the controller from harmful line transients.

 

Primary

CPS

CPS

 

 

Voltage

Assembly

Board

 

 

at 50/60 Hz

Part No.

No.

 

 

 

 

 

 

 

120V

50P-1224

50P-1200

 

 

208-220V

50P-1225

50P-1201

 

 

230-240V

50P-1226

50P-1202

 

 

277V

50P-1227

50P-1203

 

 

380-400V

50P-1228

50P-1204

 

 

416-440V

50P-1229

50P-1205

 

 

460-480V

50P-1230

50P-1206

 

 

575-600V

50P-1231

50P-1207

 

 

 

 

 

 

 

 

 

 

 

GE Zenith Controls

ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

25

Image 27 Contents
GE Zenith Controls Authorized Service Table of ContentsIntroduction Mounting SafetyEquipment Inspection and Storage Final Equipment InspectionInstallation Power ConnectionsEngine Start Control Connections IInitial Energization Installation cont’dR E T E S T Initial Energization cont’dInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerLCD & Keypad Entelli-Switch 250 Controller cont’dStandard 3-Phase Sensing on 3 and 4 Pole Units Source User Setting for Voltage & FrequencyStds Exes Cons Sens Spes Psgs Accessory Group PackagesAccessory Definitions A62Calibrate Accessory Definitions cont’d S14 R50S12P S13PUMD How to Set the System ClockLoad / No-Load CDT One Event Timer ExerciserLoad / No-Load Clock Exerciser CDP Clock ExerciserTurn options on or OFF via keypad through the CFG menu Entelli-Switch 250 User Setup CFG MenuChange adjustable values through the SET menu Entelli-Switch 250 User Setup SET MenuView System Data Entelli-Switch 250 User Setup System InfoStandard Transition TestingATS Testing Delayed TransitionSequence of Operation Timer Designations as they appear in the SET menuBypass-Isolation Operation Sequence of Operation cont’dAutomatic 100-400 AMP600-1200 AMP 1600-4000 AMP Standard and Delay Transition Controls Power Supply CPSControls Power Supply CPS cont’d Standard Transition CPS SchematicDelayed Transition CPS Schematic General Troubleshooting Troubleshooting and DiagnosticsServicing Maintenance and TestingInspection and Cleaning TestingPage GE Zenith Controls