GE ZBTSD manual Installation, Power Connections, Engine Start Control Connections

Page 4

Installation

DANGER

HAZARDOUS VOLTAGE

(Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Power Connections

GE Zenith transfer switches are supplied with UL listed solderless screw type terminals as standard for the Source 1, Source 2 and Load power connections.

Table 1 lists the number and sizes of cable lugs supplied as standard for each switch amp rating.

Connect the Source 1, Source 2, and Load conductors to the clearly marked terminals on the transfer switch. Remove surface oxides from cables by cleaning with a wire brush. Verify that all connections are correct before tightening the lugs. All cable lug connections must be tightened to the proper torque values as shown in Table 2.

H

SPREADER BAR

45°

LIFTING EYES

NOTE: Do not run cables or wiring behind front-connected transfer switches.

CABINETD

Figure 1

NOTE: When lifting the switch using a spreader bar, height H must be equal to half of distance D.

Power Connections: Screw Type Terminals for External Power Connections

Switch Size

Source 1, Source 2 & Load Terminals

Neutral Bar (When Required)

(Amps)

Cable Per Pole

Range of Wire Sizes

No. of Cables

Range of Wire Sizes

40

1

#8 AWG to 1/0

3

#8 AWG to 1/0

80

1

#8 AWG to 1/0

3

#8 AWG to 1/0

 

 

 

 

 

100

1

#8 AWG to 1/0

3

#8 AWG to 1/0

 

 

 

 

 

150

1

#8 AWG to 3/0

3

#8 AWG to 300 MCM

 

 

 

 

 

200, 225, 2500

1

#6 AWG to 250 MCM

3

#6 AWG to 300 MCM

 

 

 

 

 

260, 300, 400

1

#4 AWG to 600 MCM

3

#4 AWG to 300 MCM

600

2

#2 AWG to 600 MCM

8

#2 AWG to 600 MCM

 

 

 

 

 

800, 1000, 1200

4

#2 AWG to 600 MCM

12

#2 AWG to 600 MCM

 

 

 

 

 

1600, 2000

Line, Load and Neutral terminals are located in the rear of switch

2600, 3000, 4000

 

and arranged for bus bar locations

 

 

 

 

 

Table 1

Engine Start

Control Connections

Engine-start control wires connect to control terminals beside the Entelli-Switch 250. Engine start terminals are indicated by a schematic symbol (the symbol indicates the contact state for a de-energized normal source).

Figure 2 shows the engine-start contacts.

Make all other necessary control connections to the control panel terminal blocks per the schematics supplied with the ATS.

NOTE: All control wires (18-12 AWG) must be torqued to 19 in/lbs.

Tightening Torque for Lugs

Socket Size

 

Torque

Across Flats

Lb. - In.

 

Lb. - Ft.

1/8

45

 

4

5/32

100

 

8

3/16

120

 

10

7/32

150

 

12

1/4

200

 

17

5/16

275

 

23

3/8

375

 

31

1/2

500

 

42

9/16

600

 

50

Table 2

2

ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

GE Zenith Controls

 

Image 4 Contents
GE Zenith Controls Table of Contents Authorized ServiceIntroduction Safety Equipment Inspection and StorageFinal Equipment Inspection MountingPower Connections InstallationEngine Start Control Connections Installation cont’d IInitial EnergizationInitial Energization cont’d R E T E S TInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerEntelli-Switch 250 Controller cont’d LCD & KeypadUser Setting for Voltage & Frequency Standard 3-Phase Sensing on 3 and 4 Pole Units SourceAccessory Group Packages Stds Exes Cons Sens Spes PsgsA62 Accessory DefinitionsCalibrate Accessory Definitions cont’d R50 S12PS13P S14How to Set the System Clock UMDCDT One Event Timer Exerciser Load / No-LoadCDP Clock Exerciser Load / No-Load Clock ExerciserEntelli-Switch 250 User Setup CFG Menu Turn options on or OFF via keypad through the CFG menuEntelli-Switch 250 User Setup SET Menu Change adjustable values through the SET menuEntelli-Switch 250 User Setup System Info View System DataTesting ATS TestingDelayed Transition Standard TransitionTimer Designations as they appear in the SET menu Sequence of OperationSequence of Operation cont’d Bypass-Isolation Operation100-400 AMP Automatic600-1200 AMP 1600-4000 AMP Controls Power Supply CPS Standard and Delay TransitionStandard Transition CPS Schematic Controls Power Supply CPS cont’dDelayed Transition CPS Schematic Troubleshooting and Diagnostics General TroubleshootingMaintenance and Testing Inspection and CleaningTesting ServicingPage GE Zenith Controls