GE ZBTSD Entelli-Switch 250 User Setup SET Menu, Change adjustable values through the SET menu

Page 19

Entelli-Switch 250 User Setup - SET Menu

Change adjustable values through the SET menu.

Enter six digit access code

(The factory assigned six-digit access code is located on the back of the controller)

1

42

3

6

Engine Start Relay (De-Energized)

Network Communications (Option)

WARNING

1Controller Inputs must be relay Isolated.

A2

A1

RELAY

14

11

12

(-)

(+)

 

 

 

 

 

 

 

 

 

 

COM

J2

Customer

J2-3

*

1

PROG 1

InputN.O N.C Voltage

To

2

3

PROG 2

J2/J4

Inputs

GRD (Input Sink)

4

LS OUT

5

6

7

8

NIA OUT

ELEV. PRE. OUT

ALARM OUT

2Controller Outputs have Limited Source Capacity. Use only GE Zenith-specified Output Modules.

11

14

12

 

A1

 

(+)

 

 

 

R1

STE OUT

A2

9

10

11

MOTOR DISC. OUT

21

24

22

(-)

 

 

 

 

Output

 

 

12

TMS IN

Contacts

13

14

INHIB.>S1

INHIB.>S2

15

16

LS IN

11

14

12

21

24

22

 

R1 Output

 

 

R1 Output

 

*

Input and output availability

Contact Rating: 10A @ 250 VAC or 30 VDC

J4

subject to factory configuration.

 

*1

2

3 +12v (Output Source)

4 LN OUT

5 L4 OUT

6

L3 OUT

Lithium Battery

Exerciser Battery

 

7

L2 OUT

 

Replacement-K-4100 (BR2032)

8

L1 OUT

 

Service Life-10 Years

 

† During normal operation

9

YN IN

 

 

10

YE IN

User Access Code

Default-121212

11

TSNL IN

 

 

12

Q2/TSL IN

PRODUCT INFORMATION

www.geindustrial.com

13

S12 IN

24-Hour Service

(773)299-6600

14

S5 IN

 

 

Entelli-Switch MX250TM

Figure 11

GE Zenith Controls

ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

17

Image 19 Contents
GE Zenith Controls Table of Contents Authorized ServiceIntroduction Mounting SafetyEquipment Inspection and Storage Final Equipment InspectionPower Connections InstallationEngine Start Control Connections IInitial Energization Installation cont’dR E T E S T Initial Energization cont’dInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerLCD & Keypad Entelli-Switch 250 Controller cont’dStandard 3-Phase Sensing on 3 and 4 Pole Units Source User Setting for Voltage & FrequencyStds Exes Cons Sens Spes Psgs Accessory Group PackagesA62 Accessory DefinitionsCalibrate Accessory Definitions cont’d S14 R50S12P S13PUMD How to Set the System ClockLoad / No-Load CDT One Event Timer ExerciserLoad / No-Load Clock Exerciser CDP Clock ExerciserTurn options on or OFF via keypad through the CFG menu Entelli-Switch 250 User Setup CFG MenuChange adjustable values through the SET menu Entelli-Switch 250 User Setup SET MenuView System Data Entelli-Switch 250 User Setup System InfoStandard Transition TestingATS Testing Delayed TransitionSequence of Operation Timer Designations as they appear in the SET menuBypass-Isolation Operation Sequence of Operation cont’dAutomatic 100-400 AMP600-1200 AMP 1600-4000 AMP Standard and Delay Transition Controls Power Supply CPSStandard Transition CPS Schematic Controls Power Supply CPS cont’dDelayed Transition CPS Schematic General Troubleshooting Troubleshooting and DiagnosticsServicing Maintenance and TestingInspection and Cleaning TestingPage GE Zenith Controls