GE ZBTSD manual Installation cont’d

Page 7

Installation (cont’d)

DANGER

HAZARDOUS VOLTAGE

(Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Control Connections

Figure 6

Engine Start

Connections

Input/Output Connectors to I/O Modules

To Power

Panel

Clock Program

Backup Battery

Remove protective strip to enable clock functions

Network Connector

To CPS Box

A complete information package is furnished with each transfer switch including a complete connection diagram and schematic which details all necessary control circuit field connections.

The engine start control wires connect to the engine start relay terminals located to the left

of the microprocessor. Figure 6 shows the location of these terminals.

The terminals are clearly identified by a label on the microcontroller backplate. In the case of manual trans- fer switches, or in other applications not requiring the microprocessor, clearly marked terminal blocks are provided in the upper left corner of the control panel for the engine start control wires.

GE Zenith Controls

ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

5

Image 7 Contents
GE Zenith Controls Table of Contents Authorized ServiceIntroduction Mounting SafetyEquipment Inspection and Storage Final Equipment InspectionPower Connections InstallationEngine Start Control Connections IInitial Energization Installation cont’dR E T E S T Initial Energization cont’dInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerLCD & Keypad Entelli-Switch 250 Controller cont’dStandard 3-Phase Sensing on 3 and 4 Pole Units Source User Setting for Voltage & FrequencyStds Exes Cons Sens Spes Psgs Accessory Group PackagesA62 Accessory DefinitionsCalibrate Accessory Definitions cont’d S14 R50S12P S13PUMD How to Set the System ClockLoad / No-Load CDT One Event Timer ExerciserLoad / No-Load Clock Exerciser CDP Clock ExerciserTurn options on or OFF via keypad through the CFG menu Entelli-Switch 250 User Setup CFG MenuChange adjustable values through the SET menu Entelli-Switch 250 User Setup SET MenuView System Data Entelli-Switch 250 User Setup System InfoStandard Transition TestingATS Testing Delayed TransitionSequence of Operation Timer Designations as they appear in the SET menuBypass-Isolation Operation Sequence of Operation cont’dAutomatic 100-400 AMP600-1200 AMP 1600-4000 AMP Standard and Delay Transition Controls Power Supply CPSStandard Transition CPS Schematic Controls Power Supply CPS cont’dDelayed Transition CPS Schematic General Troubleshooting Troubleshooting and DiagnosticsServicing Maintenance and TestingInspection and Cleaning TestingPage GE Zenith Controls