Authorized Service
For GE parts and service, call: 773
Table of Contents
Page
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11 Equipment Inspection and Storage . . . . . . . . . .11 Final Equipment Inspection . . . . . . . . . . . . . . .11 Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12 Power Connections . . . . . . . . . . . . . . . . . . . . . . .12 Engine Start Control
Page
Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .119
ATS Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . .119
Standard Transition . . . . . . . . . . . . . . . . . . . . . 19
Delayed Transition . . . . . . . . . . . . . . . . . . . . . . 19
Sequence of Operation . . . . . . . . . . . . . . . . . . . . . . 20
Standard Transition . . . . . . . . . . . . . . . . . . . . .120
Delayed Transition . . . . . . . . . . . . . . . . . . . . . . 20
Controls Power Supply (CPS) . . . . . . . . . . . . . . . . . 21
Schematics, Standard & Delay . . . . . . . . . . . . .122
Troubleshooting & Diagnostics . . . . . . . . . . . . . . . . 23
Maintenance and Testing . . . . . . . . . . . . . . . . . . . . . 24
Inspection and Cleaning . . . . . . . . . . . . . . . . . 24
Servicing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .124
Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .124
ZBTSH/ZBTSDH . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Standard Control Panel Layout (SSRCP) . . . . 25
Panel Mount Control Relays . . . . . . . . . . . . . .125
Sequence of Operation . . . . . . . . . . . . . . . . . . . . . . 26
Adjustments and Settings . . . . . . . . . . . . . . . . . . . . . 27
Solid State Timers . . . . . . . . . . . . . . . . . . . . . . .127
Voltage/Frequency Sensor (VSFM) . . . . . . . . .127
Solid State Phase Relay . . . . . . . . . . . . . . . . . . .127
Introduction
GE Zenith Transfer Switches are used to provide a continuous source of power for lighting and other critical loads by auto- matically transferring from source 1 power to source 2 power in the event that source 1 voltage falls below preset limits.
Voltage sensing and system control is performed via a
All GE Zenith transfer switches are designed for use on emergency or standby systems, and are rated for total system or motor loads. Transfer switches are UL Listed under Standard 1008 and CSA Certified under Standard C22.2 No. 178 and IEC Listed under Standard 947.
NOTES:
A protective device such as a molded case circuit breaker or fused disconnect switch MUST be installed on both sources of incoming power for circuit protection and as a disconnection device.
All references made within this manual about the term “S1” or “Source 1” relate to a Normal Power Source.
All references made about the term “S2” or “Source 2” relate to an Emergency or Alternative Power Source.