Enterasys Networks C2RPS-SYS manual Rack Mounting the Chassis

Page 27

Installing C2RPS-CHAS8 into the Rack

An ambient temperature of between 5°C (41°F) and 40°C (104°F) must be maintained at the installation site with fluctuations of less than 10°C (18°F) per hour.

Caution: To ensure proper ventilation and prevent overheating, leave a minimum clearance space of 101.6 cm (4.0 in.) at the front and rear of the chassis.

Precaución: Para asegurar una buena ventilación y evitar que el sistema se sobrecaliente, deje un espacio mínimo de 10.16 cm (4 pulgadas.) con respecto a la parte delantera y trasera del chasis.

Warning: Before installing the chassis into a rack, ensure that the rack can support the device(s) without compromising the stability of the rack. Otherwise, personal injury and/or equipment damage may result.

Advertencia: Antes de instalar el chassis en un rack, asegurarse que el rack puede soportar el(los) dispositivo(s) sin comprometer la estabilidad del mismo. De otra forma puede suceder algun tipo de daño personal o del equipo.

Warnhinweis: Schützen Sie sich vor Verletzungen und Geräteschaden, überzeugen Sie sich vor der Installation des Chassis in das Rack, von dessen Stabilität.

Rack Mounting the Chassis

Refer to Figure 2‐2 and proceed as follows to install the chassis into a 19‐inch rack:

1.Position the chassis between the vertical frame members and align the mounting holes in the chassis brackets with those in the rack frame.

2.Fasten the chassis securely to the frame using ten mounting screws (user‐supplied).

SecureStack C2 Installation Guide 2-5

Image 27
Contents SecureStack C2 Redundant Power System Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Declaration of Conformity Enterasys Networks, Inc Firmware License Agreement Page Vii Viii Contents Figures Using This Guide About this GuideStructure of This Guide Using the SecureStack C2 Manual Set Following conventions are used in this guide Conventions Used in This GuideConventions Used in This Guide Xiv About this Guide RPS Overview IntroductionC2RPS-CHAS8 Chassis Power supply slot cover Captive screw 2 per coverC2RPS-PSM front view C2RPS-PSM Power Supply ModuleRPS Deployment Strategies RPS Supporting a Group of Switches up to eightSupport@enterasys.com Getting HelpGetting Help Introduction Installation Unpacking Chassis and Power Supply ModulesRequired Tools Installing C2RPS-PSMs C2RPS-PSM Installation Replacing an Installed C2RPS-PSMGuidelines for Rackmount Installation Installing C2RPS-CHAS8 into the RackRack Mounting the Chassis Fastening the C2RPS-CHAS8 to the Rack Connecting the PSM Cables and AC Power CordsC2RPS-PSM Cable C2RPS-PSM Cable and AC Power Cord Connections C2RPS-CHAS8 Chassis Specifications SpecificationsC2RPS-PSM Redundant Power Supply Output Connector C2RPS-PSM SpecificationsTable A-4 Compliance Standards Compliance StandardsCompliance Standards Specifications