Enterasys Networks 7G4205-72, 7G4285-49 manual Preparing to Install into a Chassis

Page 38

Preparing to Install into a Chassis

Preparing to Install into a Chassis

Caution: Failure to observe static safety precautions could cause damage to the module. Follow static safety handling rules and wear the antistatic wrist strap.

Do not cut the non-conductive bag to remove the module. Sharp objects contacting the board or components can cause damage.

Precaución: Si no toma las medidas de seguridad necesarias para evitar descargas de electricidad estática, es posible que el módulo se dañe. Siga los consejos de seguridad para la manipulación del producto y no olvide utilizar la pulsera antiestática.

No corte la bolsa antiestática para sacar el módulo. Tenga en cuenta que si algún objeto cortante entra en contacto con la placa o con los componentes, éstos podrían dañarse.

Warning: Install this module in a Matrix E7, N3, N5, or N7 chassis that has been installed in a Restricted Access Location only. Access to the equipment by users must be restricted through the use of a tool or lock and key or other means of security and is controlled by the authority responsible for the location.

Advertencia: Instalar este modulo en un Matrix E7, N3, N5, o N7 que ha sido localizado en un lugar de Acceso Restringido. Aceso al equipo debe ser restringido por el responsable del sitio.

Warnhinweis: Installieren Sie dieses Modul nur in einem E7, N3, N5, oder N7 Chassis, wenn sich diese in einer zugangsgeschützten Umgebung befinden. Der Bereich zu den Komponenten sollte durch ein Schloß, einen Schlüssel oder sonstigen Sicherungen geschützt und durch einen Verantwortlichen kontrolliert werden.

Before installing any module into the Matrix E7 chassis, refer to “DFE Module Placement and Installation Rules” on page 3‐3 to familiarize yourself with the FTM1 and FTM2 backplane connections and the module hardware installation rules. Then proceed as follows to prepare the DFE modules for installation.

To install a DFE module into a Matrix E7, Matrix N3, Matrix N7, or Matrix N7 chassis, proceed as follows to prepare the module for installation.

1.Remove the blank panel covering the slot in which the module will be installed. All other slots must remain covered to ensure proper airflow for cooling. (Save the blank plate in the event you need to remove the module.)

2.Remove the module from the shipping box. (Save the box and packing materials in the event the module needs to be reshipped.)

3.Locate the antistatic wrist strap shipped with the chassis. Attach the antistatic wrist strap to your wrist and plug the cable from the antistatic wrist strap into the ESD grounding receptacle at the upper right corner of the chassis.

4.Remove the module from the plastic bag. (Save the bag in the event the module must be reshipped.) Observe all precautions to prevent damage from Electrostatic Discharge (ESD).

3-6 Installation

Image 38
Contents Enterasys Matrix Page Page Industry Canada Notice Product SafetyFederal Communications Commission FCC Notice Class a ITE Notice Clase A. Aviso de ITEElektro- magnetische Kompatibilität EMC Electromagnetic Compatibility EMCCompatibilidad Electromágnetica EMC Hazardous SubstancesSupplement to Product Instructions Vcci Notice Bsmi EMC Statement TaiwanSafety Information Class 1 Laser Transceivers Declaration of ConformityEnterasys NETWORKS, INC. Firmware License Agreement Viii Page Page Contents Appendix a Specifications Figures Xiv About This Guide Who Should Use This GuideFor Refer to How to Use This GuideRelated Documents Conventions Used in This Guide Following conventions are used in this guideGetting Help Support@enterasys.comIntroduction Overview of DFE-Platinum Series Module CapabilitiesDFE Module and Interface Options 7G4285-497G4285-49 DFE-Platinum Module 7G4205-72 7G4205-72 DFE-Platinum Module Connectivity Switch Configuration Using WebViewNetwork Expansion Module NEM ManagementStandards Compatibility Switch Configuration Using CLI CommandsSecure Networks Policy Support Lanview Diagnostic LEDs Network Requirements Link Aggregation 10BASE-T Network100BASE-TX Network 1000BASE-T Network1000BASE-T Network Network Requirements Installation Required Tools Installation Site RequirementContents of DFE Module Carton Quantity Unpacking the DFE ModuleMatrix E7 Chassis Module Placement Installing an Optional Network Expansion Module NEMDFE Module Placement and Installation Rules Example 3 -1, C Example 1 -1,AExample 2 -1,B Example 6 -1, F Example 4 -1,DExample 5 -1, E Preparing to Install into a Chassis Installing the DFE Modules into a Matrix E7 or N7 Chassis Preparing to Install into a Chassis Preparing to Install into a Chassis Installing the DFE Modules into a Matrix N3 or N5 Chassis Card guides Connecting 48 Vdc Power for PoE Operation Connecting to the NetworkConnecting UTP Cables to DFE Modules Making the UTP ConnectionsConnecting a Twisted Pair Segment with RJ45 Connector RX+ TX+ TX1+ 1 RX1- 2 TX2+ 3 TX3+ 4 RX3- 5 RX2- 6 TX4+ 7 RX4 Verifying PoE Port Status Connecting to an IBM PC or Compatible Device Connecting to COM Port for Local ManagementWhat Is Needed Connecting to a VT Series Terminal Parameter SettingConnecting to a Modem 10 Connecting a VT Series Terminal11 Connecting to a Modem RJ45 DB25 Adapter Wiring and Signal AssignmentsCOM Port Adapter Wiring and Signal Diagram RJ45 Modem Port Adapter Wiring and Signal Diagram First-Time Log-In Using a Console Port Connection Completing the InstallationCompleting the Installation of a New System 12 Matrix DFE Startup Screen Example N7 Chassis Logging in with an Administratively-Configured User Account EnterAbout the Management Mgmt LED TroubleshootingUsing Lanview Viewing Receive/Transmit Activity on 7G4285-49 Lanview LEDs on 7G4285-49Viewing Receive/Transmit Activity on 7G4205-72 Lanview LEDs on 7G4205-72Viewing the PoE Port Status Lanview LEDs Color State Recommended ActionLED RX/TX Troubleshooting Checklist Platinum Series Configuration Guide forTroubleshooting Checklist Problem Possible Cause Recommended ActionOverview of DFE Module Shutdown Procedure Recommended Shutdown Procedure Using OFFLINE/RESET Switch OFFLINE/RESET SwitchLast Resort Shutdown Procedure Using OFFLINE/RESET Switch Specifications Processors/Memory DFE Module SpecificationsTable A-1 7G4285-49 Specifications PhysicalTable A-2 7G4205-72 Specifications Regulatory Compliance Table A-3 COM Port Pin Assignments Signal Name Input/OutputCOM Port Pinout Assignments Table A-4 Compliance Standards Regulatory ComplianceMode Switch Settings and Option Installations Setting the Mode Switches Memory Locations and Replacement Procedures Dram Simm Dimm Gaining Access to Memory Modules Removing the Safety CoverFigure B-3 Removing the Safety Cover Dram Simm Replacement Procedure Figure B-4 Removing the Optional Network Expansion ModuleGaining Access to Memory Modules Removing the Dimm Dimm Replacement Procedure Figure B-6 Installing the DimmFigure B-7 Removing the Existing Dimm Installing the Network Expansion Module NEM Figure B-8 Installing the DimmFigure B-9 Installing the Network Expansion Module NEM Reinstalling the Safety Cover Figure B-10 Installing the Safety Cover Page About PoE Power over Ethernet OverviewProprietary PD Detection PoE Port Status LEDs Table C-2 PoE Status LED Indications PoE Port StatusOverview About PoE Power over Ethernet Index NumericsNEM B-12 installing