Enterasys Networks 7G4205-72 Troubleshooting Checklist, Platinum Series Configuration Guide for

Page 66

Troubleshooting Checklist

Troubleshooting Checklist

If the module is not working properly, refer to Table 4‐2 on page 4‐8 for a checklist of problems, possible causes, and recommended actions to resolve the problem.

Table 4-2 Troubleshooting Checklist

Problem

Possible Cause

Recommended Action

 

 

 

All LEDs are OFF.

Loss of power.

Ensure that the DFE module was installed

 

 

properly according to the installation

 

 

instructions in Chapter 3, and that the

 

 

host chassis is providing power.

 

 

 

No Local

Incorrect terminal setup.

Refer to the Enterasys Matrix DFE-

Management

 

Platinum Series Configuration Guide for

Password screen.

 

proper setup procedures.

 

 

 

 

Improper console cable

Refer to Appendix A for proper COM port

 

pinouts.

pinouts.

 

 

 

 

Corrupt firmware image, or

If possible, attempt to download the

 

hardware fault.

image to the DFE module again. Refer to

 

 

Setting the Mode Switches” on page B-2

 

 

for instructions to clear NVRAM.

 

 

 

Cannot navigate

Improper username/ password

If the username/password combination

beyond Password

combination entered.

has been forgotten, refer to “Setting the

screen.

 

Mode Switches” on page B-2 for

 

 

instructions on how to set the mode

 

 

switch to reset the username/password

 

 

combination to the default values.

4-8 Troubleshooting

Image 66
Contents Enterasys Matrix Page Page Industry Canada Notice Product SafetyFederal Communications Commission FCC Notice Class a ITE Notice Clase A. Aviso de ITEElektro- magnetische Kompatibilität EMC Electromagnetic Compatibility EMCCompatibilidad Electromágnetica EMC Hazardous SubstancesSupplement to Product Instructions Vcci Notice Bsmi EMC Statement TaiwanSafety Information Class 1 Laser Transceivers Declaration of ConformityEnterasys NETWORKS, INC. Firmware License Agreement Viii Page Page Contents Appendix a Specifications Figures Xiv About This Guide Who Should Use This GuideHow to Use This Guide Related DocumentsFor Refer to Conventions Used in This Guide Following conventions are used in this guideGetting Help Support@enterasys.comIntroduction Overview of DFE-Platinum Series Module CapabilitiesDFE Module and Interface Options 7G4285-497G4285-49 DFE-Platinum Module 7G4205-72 7G4205-72 DFE-Platinum Module Connectivity Switch Configuration Using WebViewNetwork Expansion Module NEM ManagementSwitch Configuration Using CLI Commands Secure Networks Policy SupportStandards Compatibility Lanview Diagnostic LEDs Network Requirements Link Aggregation 10BASE-T Network100BASE-TX Network 1000BASE-T Network1000BASE-T Network Network Requirements Installation Required Tools Installation Site RequirementContents of DFE Module Carton Quantity Unpacking the DFE ModuleInstalling an Optional Network Expansion Module NEM DFE Module Placement and Installation RulesMatrix E7 Chassis Module Placement Example 1 -1,A Example 2 -1,BExample 3 -1, C Example 4 -1,D Example 5 -1, EExample 6 -1, F Preparing to Install into a Chassis Installing the DFE Modules into a Matrix E7 or N7 Chassis Preparing to Install into a Chassis Preparing to Install into a Chassis Installing the DFE Modules into a Matrix N3 or N5 Chassis Card guides Connecting 48 Vdc Power for PoE Operation Connecting to the NetworkConnecting UTP Cables to DFE Modules Making the UTP ConnectionsConnecting a Twisted Pair Segment with RJ45 Connector RX+ TX+ TX1+ 1 RX1- 2 TX2+ 3 TX3+ 4 RX3- 5 RX2- 6 TX4+ 7 RX4 Verifying PoE Port Status Connecting to COM Port for Local Management What Is NeededConnecting to an IBM PC or Compatible Device Connecting to a VT Series Terminal Parameter SettingConnecting to a Modem 10 Connecting a VT Series Terminal11 Connecting to a Modem Adapter Wiring and Signal Assignments COM Port Adapter Wiring and Signal Diagram RJ45RJ45 DB25 Modem Port Adapter Wiring and Signal Diagram Completing the Installation Completing the Installation of a New SystemFirst-Time Log-In Using a Console Port Connection 12 Matrix DFE Startup Screen Example N7 Chassis Logging in with an Administratively-Configured User Account EnterTroubleshooting Using LanviewAbout the Management Mgmt LED Viewing Receive/Transmit Activity on 7G4285-49 Lanview LEDs on 7G4285-49Viewing Receive/Transmit Activity on 7G4205-72 Lanview LEDs on 7G4205-72Viewing the PoE Port Status Lanview LEDs Color State Recommended ActionLED RX/TX Troubleshooting Checklist Platinum Series Configuration Guide forTroubleshooting Checklist Problem Possible Cause Recommended ActionOverview of DFE Module Shutdown Procedure Recommended Shutdown Procedure Using OFFLINE/RESET Switch OFFLINE/RESET SwitchLast Resort Shutdown Procedure Using OFFLINE/RESET Switch Specifications Processors/Memory DFE Module SpecificationsTable A-1 7G4285-49 Specifications PhysicalTable A-2 7G4205-72 Specifications Regulatory Compliance Table A-3 COM Port Pin Assignments Signal Name Input/OutputCOM Port Pinout Assignments Table A-4 Compliance Standards Regulatory ComplianceMode Switch Settings and Option Installations Setting the Mode Switches Memory Locations and Replacement Procedures Dram Simm Dimm Gaining Access to Memory Modules Removing the Safety CoverFigure B-3 Removing the Safety Cover Dram Simm Replacement Procedure Figure B-4 Removing the Optional Network Expansion ModuleGaining Access to Memory Modules Removing the Dimm Dimm Replacement Procedure Figure B-6 Installing the DimmFigure B-7 Removing the Existing Dimm Installing the Network Expansion Module NEM Figure B-8 Installing the DimmFigure B-9 Installing the Network Expansion Module NEM Reinstalling the Safety Cover Figure B-10 Installing the Safety Cover Page About PoE Power over Ethernet OverviewProprietary PD Detection PoE Port Status LEDs Table C-2 PoE Status LED Indications PoE Port StatusOverview About PoE Power over Ethernet Index NumericsNEM B-12 installing