Enterasys Networks 7G4205-72, 7G4285-49 Installing the DFE Modules into a Matrix N3 or N5 Chassis

Page 42

Preparing to Install into a Chassis

Installing the DFE Modules into a Matrix N3 or N5 Chassis

Caution: Failure to observe static safety precautions could cause damage to the module. Follow static safety handling rules and wear the antistatic wrist strap.

Do not cut the non-conductive bag to remove the module. Sharp objects contacting the board or components can cause damage.

Precaución: Si no toma las medidas de seguridad necesarias para evitar descargas de electricidad estática, es posible que el módulo se dañe. Siga los consejos de seguridad para la manipulación del producto y no olvide utilizar la pulsera antiestática.

No corte la bolsa antiestática para sacar el módulo. Tenga en cuenta que si algún objeto cortante entra en contacto con la placa o con los componentes, éstos podrían dañarse.

A DFE‐Platinum module can be installed in any available N3 chassis slot (1 through 3). To install a module into the Matrix N3 chassis, refer to Figure 3‐3 and proceed as follows:

1.Prepare the DFE modules using the procedure described in “Preparing to Install into a Chassis” on page 3‐6.

Caution: When setting the locking levers to the closed position, do not try to force the locking levers to the point that they touch the face of the front panel. Forcing the locking levers to this point could damage the module and chassis.

Precaución: Al mover las palancas a la posición de cerrado, tenga cuidado de no llevarlas a un punto en donde estén en contacto con el panel frontal. Si lo hace, podría dañar el módulo o el chasis.

2.Locate the chassis card guides that line up with the slot number in which the module will be installed. Make sure the module locking levers are in the open position (top and bottom).

3.Align the module card between the upper and lower card guides of the desired slot and slide it into the chassis, taking care that the module slides in straight. See Caution below.

Caution: Due to the amount of force needed to properly seat the module connectors into the backplane connectors, it is best to apply force to the end of the levers to insert (or eject) the module. Otherwise, damage could result to the module and chassis.

Precaución: Para colocar los conectores del módulo en los conectores del panel posterior correctamente es necesario hacer bastante fuerza, por ello, para insertar o quitar el módulo, se recomienda concentrar la fuerza en el extremo de las palancas. Si no lo hace, podría dañar el módulo y el chasis.

3-10 Installation

Image 42
Contents Enterasys Matrix Page Page Industry Canada Notice Product SafetyFederal Communications Commission FCC Notice Class a ITE Notice Clase A. Aviso de ITEElektro- magnetische Kompatibilität EMC Electromagnetic Compatibility EMCCompatibilidad Electromágnetica EMC Hazardous SubstancesSupplement to Product Instructions Vcci Notice Bsmi EMC Statement TaiwanSafety Information Class 1 Laser Transceivers Declaration of ConformityEnterasys NETWORKS, INC. Firmware License Agreement Viii Page Page Contents Appendix a Specifications Figures Xiv About This Guide Who Should Use This GuideHow to Use This Guide Related DocumentsFor Refer to Conventions Used in This Guide Following conventions are used in this guideGetting Help Support@enterasys.comIntroduction Overview of DFE-Platinum Series Module CapabilitiesDFE Module and Interface Options 7G4285-497G4285-49 DFE-Platinum Module 7G4205-72 7G4205-72 DFE-Platinum Module Connectivity Switch Configuration Using WebViewNetwork Expansion Module NEM ManagementSwitch Configuration Using CLI Commands Secure Networks Policy SupportStandards Compatibility Lanview Diagnostic LEDs Network Requirements Link Aggregation 10BASE-T Network100BASE-TX Network 1000BASE-T Network1000BASE-T Network Network Requirements Installation Required Tools Installation Site RequirementContents of DFE Module Carton Quantity Unpacking the DFE ModuleInstalling an Optional Network Expansion Module NEM DFE Module Placement and Installation RulesMatrix E7 Chassis Module Placement Example 1 -1,A Example 2 -1,BExample 3 -1, C Example 4 -1,D Example 5 -1, EExample 6 -1, F Preparing to Install into a Chassis Installing the DFE Modules into a Matrix E7 or N7 Chassis Preparing to Install into a Chassis Preparing to Install into a Chassis Installing the DFE Modules into a Matrix N3 or N5 Chassis Card guides Connecting 48 Vdc Power for PoE Operation Connecting to the NetworkConnecting UTP Cables to DFE Modules Making the UTP ConnectionsConnecting a Twisted Pair Segment with RJ45 Connector RX+ TX+ TX1+ 1 RX1- 2 TX2+ 3 TX3+ 4 RX3- 5 RX2- 6 TX4+ 7 RX4 Verifying PoE Port Status Connecting to COM Port for Local Management What Is NeededConnecting to an IBM PC or Compatible Device Connecting to a VT Series Terminal Parameter SettingConnecting to a Modem 10 Connecting a VT Series Terminal11 Connecting to a Modem Adapter Wiring and Signal Assignments COM Port Adapter Wiring and Signal Diagram RJ45RJ45 DB25 Modem Port Adapter Wiring and Signal Diagram Completing the Installation Completing the Installation of a New SystemFirst-Time Log-In Using a Console Port Connection 12 Matrix DFE Startup Screen Example N7 Chassis Logging in with an Administratively-Configured User Account EnterTroubleshooting Using LanviewAbout the Management Mgmt LED Viewing Receive/Transmit Activity on 7G4285-49 Lanview LEDs on 7G4285-49Viewing Receive/Transmit Activity on 7G4205-72 Lanview LEDs on 7G4205-72Viewing the PoE Port Status Lanview LEDs Color State Recommended ActionLED RX/TX Troubleshooting Checklist Platinum Series Configuration Guide forTroubleshooting Checklist Problem Possible Cause Recommended ActionOverview of DFE Module Shutdown Procedure Recommended Shutdown Procedure Using OFFLINE/RESET Switch OFFLINE/RESET SwitchLast Resort Shutdown Procedure Using OFFLINE/RESET Switch Specifications Processors/Memory DFE Module SpecificationsTable A-1 7G4285-49 Specifications PhysicalTable A-2 7G4205-72 Specifications Regulatory Compliance Table A-3 COM Port Pin Assignments Signal Name Input/OutputCOM Port Pinout Assignments Table A-4 Compliance Standards Regulatory ComplianceMode Switch Settings and Option Installations Setting the Mode Switches Memory Locations and Replacement Procedures Dram Simm Dimm Gaining Access to Memory Modules Removing the Safety CoverFigure B-3 Removing the Safety Cover Dram Simm Replacement Procedure Figure B-4 Removing the Optional Network Expansion ModuleGaining Access to Memory Modules Removing the Dimm Dimm Replacement Procedure Figure B-6 Installing the DimmFigure B-7 Removing the Existing Dimm Installing the Network Expansion Module NEM Figure B-8 Installing the DimmFigure B-9 Installing the Network Expansion Module NEM Reinstalling the Safety Cover Figure B-10 Installing the Safety Cover Page About PoE Power over Ethernet OverviewProprietary PD Detection PoE Port Status LEDs Table C-2 PoE Status LED Indications PoE Port StatusOverview About PoE Power over Ethernet Index NumericsNEM B-12 installing