Enterasys Networks 7G4205-72 Connecting 48 Vdc Power for PoE Operation, Connecting to the Network

Page 44

Connecting 48 Vdc Power for PoE Operation

Connecting 48 Vdc Power for PoE Operation

The Matrix N7 (7C105‐P) chassis provides 48 Vdc to connected PDs (powered devices) by way of its backplane connection to a PoE‐compliant DFE module such as the 7G4285‐49 or 7G4205‐72.

For a Matrix E7, (6C107), Matrix N3 (7C103) and Matrix N7 (7C107) chassis, an optional external Enterasys Matrix N‐POE Power System is required to support PD connections to the 7G4285‐49. The power from the Matrix N‐POE Power System is supplied through a DC power cable connection to the front‐panel 48 Vdc Optional Power connector on the 7G4285‐49.

Warning: The 48 V wire harness contains two fuses, F11 and F29. If a fuse needs to be replaced, it must be done by service personnel only. The fuse must be replaced with the same Type and Rated fuse 20 A, 400 VDC.

Advertencia: E arnes del cable de 48V contiene dos fusibles, F11 y F29. Si un fusible requiere ser reemplazado, debe ser hecho por personal de servicio unicamente. El fusible debe ser reemplazado por uno del mismo tipo y clasificado como fusible de 20 A,

400 VDC.

Warnhinweis: Im Kabelbaum der 48V Zuleitung befinden sich 2 Sicherungen, F11 und F29. Die Sicherung darf nur duch Fachpersonal getauscht werden und darf auch nur durch den gleichen Typ ersetzt werden ( 20A / 400VDC ).

Note: If you are planning to install a PoE-compliant DFE module such as the 7G4285-49 in a Matrix N3 (7C103) or Matrix N7 (7C107) chassis, install and connect the Matrix N-POE Power System before connecting to PDs.

Refer to the Matrix N‐Series N‐POE Power System Installation Guide to install and connect a Matrix N‐POE Power System to the 7G4285‐49.

Connecting to the Network

This section provides the procedures for connecting unshielded twisted pair (UTP) segments from the network or other devices to the 7G4285‐49 and 7G4205‐72 (“Connecting UTP Cables to DFE Modules” on page 3‐13).

Note: If the module is being installed in a network using Link Aggregation, there are rules concerning the network cable and port configurations that must be followed for Link Aggregation to operate properly. Before connecting the cables, refer to the Enterasys Matrix DFE-Platinum Series Configuration Guide for the configuration information. For details on how to obtain manuals, refer to the “Related Documents” in About This Guide.

3-12 Installation

Image 44
Contents Enterasys Matrix Page Page Product Safety Federal Communications Commission FCC NoticeIndustry Canada Notice Class a ITE Notice Clase A. Aviso de ITEElectromagnetic Compatibility EMC Compatibilidad Electromágnetica EMCElektro- magnetische Kompatibilität EMC Hazardous SubstancesSupplement to Product Instructions Vcci Notice Bsmi EMC Statement TaiwanSafety Information Class 1 Laser Transceivers Declaration of ConformityEnterasys NETWORKS, INC. Firmware License Agreement Viii Page Page Contents Appendix a Specifications Figures Xiv About This Guide Who Should Use This GuideFor Refer to How to Use This GuideRelated Documents Conventions Used in This Guide Following conventions are used in this guideGetting Help Support@enterasys.comIntroduction Overview of DFE-Platinum Series Module CapabilitiesDFE Module and Interface Options 7G4285-497G4285-49 DFE-Platinum Module 7G4205-72 7G4205-72 DFE-Platinum Module Switch Configuration Using WebView Network Expansion Module NEMConnectivity ManagementStandards Compatibility Switch Configuration Using CLI CommandsSecure Networks Policy Support Lanview Diagnostic LEDs Network Requirements Link Aggregation 10BASE-T Network100BASE-TX Network 1000BASE-T Network1000BASE-T Network Network Requirements Installation Installation Site Requirement Contents of DFE Module Carton QuantityRequired Tools Unpacking the DFE ModuleMatrix E7 Chassis Module Placement Installing an Optional Network Expansion Module NEMDFE Module Placement and Installation Rules Example 3 -1, C Example 1 -1,AExample 2 -1,B Example 6 -1, F Example 4 -1,DExample 5 -1, E Preparing to Install into a Chassis Installing the DFE Modules into a Matrix E7 or N7 Chassis Preparing to Install into a Chassis Preparing to Install into a Chassis Installing the DFE Modules into a Matrix N3 or N5 Chassis Card guides Connecting 48 Vdc Power for PoE Operation Connecting to the NetworkConnecting UTP Cables to DFE Modules Making the UTP ConnectionsConnecting a Twisted Pair Segment with RJ45 Connector RX+ TX+ TX1+ 1 RX1- 2 TX2+ 3 TX3+ 4 RX3- 5 RX2- 6 TX4+ 7 RX4 Verifying PoE Port Status Connecting to an IBM PC or Compatible Device Connecting to COM Port for Local ManagementWhat Is Needed Connecting to a VT Series Terminal Parameter SettingConnecting to a Modem 10 Connecting a VT Series Terminal11 Connecting to a Modem RJ45 DB25 Adapter Wiring and Signal AssignmentsCOM Port Adapter Wiring and Signal Diagram RJ45 Modem Port Adapter Wiring and Signal Diagram First-Time Log-In Using a Console Port Connection Completing the InstallationCompleting the Installation of a New System 12 Matrix DFE Startup Screen Example N7 Chassis Logging in with an Administratively-Configured User Account EnterAbout the Management Mgmt LED TroubleshootingUsing Lanview Viewing Receive/Transmit Activity on 7G4285-49 Lanview LEDs on 7G4285-49Viewing Receive/Transmit Activity on 7G4205-72 Lanview LEDs on 7G4205-72Viewing the PoE Port Status Lanview LEDs Color State Recommended ActionLED RX/TX Troubleshooting Checklist Platinum Series Configuration Guide forTroubleshooting Checklist Problem Possible Cause Recommended ActionOverview of DFE Module Shutdown Procedure Recommended Shutdown Procedure Using OFFLINE/RESET Switch OFFLINE/RESET SwitchLast Resort Shutdown Procedure Using OFFLINE/RESET Switch Specifications DFE Module Specifications Table A-1 7G4285-49 SpecificationsProcessors/Memory PhysicalTable A-2 7G4205-72 Specifications Table A-3 COM Port Pin Assignments Signal Name Input/Output COM Port Pinout AssignmentsRegulatory Compliance Table A-4 Compliance Standards Regulatory ComplianceMode Switch Settings and Option Installations Setting the Mode Switches Memory Locations and Replacement Procedures Dram Simm Dimm Gaining Access to Memory Modules Removing the Safety CoverFigure B-3 Removing the Safety Cover Dram Simm Replacement Procedure Figure B-4 Removing the Optional Network Expansion ModuleGaining Access to Memory Modules Removing the Dimm Dimm Replacement Procedure Figure B-6 Installing the DimmFigure B-7 Removing the Existing Dimm Installing the Network Expansion Module NEM Figure B-8 Installing the DimmFigure B-9 Installing the Network Expansion Module NEM Reinstalling the Safety Cover Figure B-10 Installing the Safety Cover Page About PoE Power over Ethernet OverviewProprietary PD Detection PoE Port Status LEDs Table C-2 PoE Status LED Indications PoE Port StatusOverview About PoE Power over Ethernet Index NumericsNEM B-12 installing