Rack Mounting the Switch

Guidelines for Rackmount Installation

The installation site must be within reach of the network cabling and meet the requirements listed below:

Appropriate grounded power receptacles must be located within 152 cm (5 ft) of the location.

A temperature of between 0°C (32°F) and 40°C (104°F) must be maintained at the installation site with fluctuations of less than 10°C (18°F) per hour.

If an optional redundant power system is going to be installed and connected to the 14‐pin Redundant Power Supply input connector on the rear of the switch, refer to the installation guide shipped with the redundant power system.

Note: To ensure proper ventilation and prevent overheating, leave a minimum clearance space of 5.1 cm (2.0 in.) at the left, right, and rear of the switch.

Warning: Before rack-mounting the switch, ensure that the rack can support it without compromising stability. Otherwise, personal injury and/or equipment damage may result.

Advertencia: Antes de montar el equipo en el rack, asegurarse que el rack puede soportar su peso sin comprometer su propia estabilidad, de otra forma, daño personal o del equipo puede ocurrir.

Warnhinweis: Überzeugen Sie sich vor dem Einbau des Gerätes in das Rack von dessen Stabilität, ansonsten könnten Personenschäden oder Schäden am Gerät die Folge sein.

Attaching Brackets and Installing in Rack

Proceed as follows to install the switch into a 19‐inch rack:

1.Attach the rackmount brackets to the switch, as shown in Figure 3‐6, using the eight M3x6 mm flathead screws shipped with the switch.

Figure 3-6 Attaching the Rackmount Brackets

1 Rackmount brackets

2 M3x6 mm flathead screws

3-10 Hardware Installation

Image 38
Contents SecureStack A2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Safety Information Class 1 Laser Transceivers Declaration of Conformity Enterasys Networks, Inc Firmware License Agreement Vii Viii Contents Troubleshooting Figures Xii About This Guide Who Should Use This GuideHow to Use This Guide Related DocumentsConventions Used in This Guide Following conventions are used in this guideConventions Used in This Guide Xvi About This Guide Introduction OverviewA2H254-16 Redundant Power Supply Capability Stack ConnectionsConnectivity Description of Mini-GBICsSwitch Configuration Using CLI Commands Lanview Diagnostic LEDsSwitch Configuration Using WebView ManagementGetting Help Network Requirements 10BASE-TX Twisted Pair Network100BASE-FX Multimode Fiber-Optic Network 100BASE-TX Twisted Pair Network1000BASE-T Twisted Pair Gigabit Ethernet Network 1000BASE-FX Fiber-Optic Network 1000BASE-FX Fiber-Optic Network Network Requirements Hardware Installation Contents of Switch Carton Considerations Prior to InstallationUnpacking the Switch Required ToolsInstalling Optional Mini-GBICs PreparationInstallation Mini-GBIC with MT-RJ Connector Mini-GBIC with LC Connector Removing the Mini-GBICInstalling the Switch on a Flat Surface Installing the Rubber FeetGuidelines for Flat Surface Installation Chassis Bottom, Rubber Feet PlacementRack Mounting the Switch Area Guidelines for Switch Installation on Flat SurfaceGuidelines for Rackmount Installation Attaching Brackets and Installing in RackConnecting Stacking Cables Fastening the Switch to the RackConfiguring Switches in a Stack About SecureStack A2 Switch Operation in a StackConfiguring Switches in a Stack Recommended Procedures for New and Existing Stacks Installing a New Stackable System of Up to Eight SwitchesConnecting AC and RPS-SYS Power AC PowerSwitch Rear View C2RPS-SYS Redundant Power System 10 Accessing the RPS ConnectorStack Initialization Overview Connecting to Console Port for Local ManagementWhat Is Needed Connecting to an IBM or Compatible Device DB9 Male Console Port Pinout AssignmentsConnecting to a VT Series Terminal 12 Connecting an IBM PC or CompatibleConnecting to a Modem 13 Connecting a VT Series Terminal14 Connecting to a Modem Connecting to the Network Connecting Fiber-Optic Cables to Fixed MT-RJ Ports15 Connecting a Fiber-Optic Cable Segment to MT-RJ Port Connecting Fiber-Optic Cables to MT-RJ Mini-GBIC Ports Connecting to the Network Connecting Fiber-Optic Cables to LC Mini-GBIC Ports Connecting to the Network Connecting UTP Cables to RJ45 Ports 16 Connecting a UTP Cable Segment to RJ45 PortConnecting to the Network 17 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Completing the Installation Initial Logon to Switch ManagementCompleting the Installation Hardware Installation Troubleshooting This chapter provides information concerning the followingUsing Lanview Lanview LEDs of A2H254-16Lanview LEDs Color State Recommended ActionDown RPS Troubleshooting Checklist Configuration Guide for proper setupConfiguration Guide for the IP address Using the Reset Password Button Reset Password ButtonTable A-1 A2H254-16 Switch Specifications SpecificationsSwitch Specifications Physical EnvironmentalMini-GBIC Input/Output Specifications Table A-2 Mini-GBIC Input/Output Port SpecificationsMGBIC-LC03 Specifications 1000BASE-SX Gigabit Ethernet SpecificationsMGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX MGBIC-LC09 Specifications 1000BASE-LX Table A-9 MGBIC-08 Optical Specifications MGBIC-08 Specifications 1000BASE-ELXMGBIC-02 Specifications 1000BASE-T Table A-11 MGBIC-02 SpecificationsTable A-12 Compliance Standards Regulatory Compliance Console Port Pinout AssignmentsRegulatory Compliance Regulatory Compliance Specifications Index NumericsIndex-2