Numerics
1000BASE-FX requirements 2-3
1000BASE-T requirements 2-2
100BASE-FX requirements 2-2
100BASE-T requirements 2-2
10BASE-T requirements 2-1
A
A2H254-16 overview of 1-2
C Cable
fiber budget A-3Cable specifications
1000BASE-FX network 2-31000BASE-T network 2-2100BASE-FX network 2-2100BASE-T network 2-210BASE-T network 2-1
CLI command introduction to 1-5
Configuring switches stack configuration 3-12
Connecting Fiber-Optic Cables from A2H254-16 to the Network 3-23
Connecting to the network 3-23Connectivity
introduction to 1-4
Console Port Pinout Assignments A-7
D
Document conventions xv
E
Electromagnetic Compatibility (EMC)
requirements A-7
Enterasys
contacting 1-6
F
Fiber budget A-3
Index
I Installation
connecting to the network 3-23in a rack 3-9
new stack 3-14
new switch in existing stack 3-15stacking cables 3-11
Installation site
what is needed at the 3-8Installing Optional Mini-GBICs 3-3
L
LANVIEW Diagnostic LEDs
introduction to 1-5
LANVIEW LEDs 4-2
Link LEDs
viewing of 4-2
Local Management
introduction to 1-5
M
Management use of 1-5
MGBIC-02 specifications for A-6
MGBIC-08 specifications for A-6
MGBIC-LC01 specifications for A-4
MGBIC-LC03 specifications for A-4
MGBIC-LC09 specifications for A-5
MGBIC-MT01 specifications for A-4
Mini-GBIC removal of 3-6
Mini-GBIC input/outputs specifications for A-3
N
Notices
General ii