Enterasys Networks A2H254-16 manual Hardware Installation

Page 29

3

Hardware Installation

Electrical Hazard: Only qualified personnel should perform installation procedures.

Riesgo Electrico: Solamente personal calificado debe realizar procedimientos de instalacion.

Elektrischer Gefahrenhinweis: Installationen sollten nur durch ausgebildetes und qualifiziertes Personal vorgenommen werden.

Important Notice

Read the Release Notes shipped with the switch to check for any exceptions to the supported features and operation documented in this guide.

This chapter provides instructions to install the A2H254‐16. Follow the order of the sections listed below to correctly install the switch.

For information about...

Refer to page...

 

 

Considerations Prior to Installation

3-2

 

 

Required Tools

3-2

 

 

Unpacking the Switch

3-2

 

 

Installing Optional Mini-GBICs

3-3

 

 

Installing the Switch on a Flat Surface

3-7

 

 

Rack Mounting the Switch

3-9

 

 

Connecting Stacking Cables

3-11

 

 

Configuring Switches in a Stack

3-12

 

 

Connecting AC and RPS-SYS Power

3-15

 

 

Connecting to Console Port for Local Management

3-18

 

 

Connecting to the Network

3-23

 

 

Completing the Installation

3-33

 

 

SecureStack A2 Installation Guide 3-1

Image 29
Contents SecureStack A2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Safety Information Class 1 Laser Transceivers Declaration of Conformity Enterasys Networks, Inc Firmware License Agreement Vii Viii Contents Troubleshooting Figures Xii Who Should Use This Guide About This GuideRelated Documents How to Use This GuideFollowing conventions are used in this guide Conventions Used in This GuideConventions Used in This Guide Xvi About This Guide Overview IntroductionA2H254-16 Stack Connections Redundant Power Supply CapabilityDescription of Mini-GBICs ConnectivitySwitch Configuration Using WebView Lanview Diagnostic LEDsSwitch Configuration Using CLI Commands ManagementGetting Help 10BASE-TX Twisted Pair Network Network Requirements100BASE-FX Multimode Fiber-Optic Network 100BASE-TX Twisted Pair Network1000BASE-T Twisted Pair Gigabit Ethernet Network 1000BASE-FX Fiber-Optic Network 1000BASE-FX Fiber-Optic Network Network Requirements Hardware Installation Unpacking the Switch Considerations Prior to InstallationContents of Switch Carton Required ToolsPreparation Installing Optional Mini-GBICsInstallation Mini-GBIC with MT-RJ Connector Removing the Mini-GBIC Mini-GBIC with LC ConnectorInstalling the Rubber Feet Installing the Switch on a Flat SurfaceChassis Bottom, Rubber Feet Placement Guidelines for Flat Surface InstallationArea Guidelines for Switch Installation on Flat Surface Rack Mounting the SwitchAttaching Brackets and Installing in Rack Guidelines for Rackmount InstallationFastening the Switch to the Rack Connecting Stacking CablesAbout SecureStack A2 Switch Operation in a Stack Configuring Switches in a StackConfiguring Switches in a Stack Installing a New Stackable System of Up to Eight Switches Recommended Procedures for New and Existing StacksAC Power Connecting AC and RPS-SYS PowerSwitch Rear View 10 Accessing the RPS Connector C2RPS-SYS Redundant Power SystemStack Initialization Overview Connecting to Console Port for Local ManagementWhat Is Needed DB9 Male Console Port Pinout Assignments Connecting to an IBM or Compatible Device12 Connecting an IBM PC or Compatible Connecting to a VT Series Terminal13 Connecting a VT Series Terminal Connecting to a Modem14 Connecting to a Modem Connecting Fiber-Optic Cables to Fixed MT-RJ Ports Connecting to the Network15 Connecting a Fiber-Optic Cable Segment to MT-RJ Port Connecting Fiber-Optic Cables to MT-RJ Mini-GBIC Ports Connecting to the Network Connecting Fiber-Optic Cables to LC Mini-GBIC Ports Connecting to the Network 16 Connecting a UTP Cable Segment to RJ45 Port Connecting UTP Cables to RJ45 PortsConnecting to the Network 17 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Initial Logon to Switch Management Completing the InstallationCompleting the Installation Hardware Installation This chapter provides information concerning the following TroubleshootingLanview LEDs of A2H254-16 Using LanviewColor State Recommended Action Lanview LEDsDown RPS Configuration Guide for proper setup Troubleshooting ChecklistConfiguration Guide for the IP address Reset Password Button Using the Reset Password ButtonTable A-1 A2H254-16 Switch Specifications SpecificationsSwitch Specifications Environmental PhysicalTable A-2 Mini-GBIC Input/Output Port Specifications Mini-GBIC Input/Output SpecificationsMGBIC-LC03 Specifications 1000BASE-SX Gigabit Ethernet SpecificationsMGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX MGBIC-LC09 Specifications 1000BASE-LX MGBIC-02 Specifications 1000BASE-T MGBIC-08 Specifications 1000BASE-ELXTable A-9 MGBIC-08 Optical Specifications Table A-11 MGBIC-02 SpecificationsTable A-12 Compliance Standards Regulatory Compliance Console Port Pinout AssignmentsRegulatory Compliance Regulatory Compliance Specifications Numerics IndexIndex-2