Enterasys Networks A2H254-16 manual Contents

Page 11

 

Contents

About This Guide

 

Who Should Use This Guide

xiii

How to Use This Guide

xiv

Related Documents

xiv

Conventions Used in This Guide

xv

Chapter 1: Introduction

 

Overview

1-1

A2H254-16

1-2

Stack Connections

1-3

Redundant Power Supply Capability

1-3

Connectivity

1-4

Management

1-5

Switch Configuration Using WebView

1-5

Switch Configuration Using CLI Commands

1-5

Standards Compatibility

1-5

LANVIEW Diagnostic LEDs

1-5

Getting Help

1-6

Chapter 2: Network Requirements

 

10BASE-TX Twisted Pair Network

2-1

100BASE-TX Twisted Pair Network

2-2

1000BASE-T Twisted Pair Gigabit Ethernet Network

2-2

100BASE-FX Multimode Fiber-Optic Network

2-2

1000BASE-FXFiber-Optic Network

2-3

Chapter 3: Hardware Installation

 

Considerations Prior to Installation

3-2

Required Tools

3-2

Unpacking the Switch

3-2

Installing Optional Mini-GBICs

3-3

Removing the Mini-GBIC

3-6

Installing the Switch on a Flat Surface

3-7

Installing the Rubber Feet

3-7

Guidelines for Flat Surface Installation

3-8

Rack Mounting the Switch

3-9

Guidelines for Rackmount Installation

3-10

Attaching Brackets and Installing in Rack

3-10

Connecting Stacking Cables

3-11

ix

Image 11
Contents SecureStack A2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Safety Information Class 1 Laser Transceivers Declaration of Conformity Enterasys Networks, Inc Firmware License Agreement Vii Viii Contents Troubleshooting Figures Xii Who Should Use This Guide About This GuideRelated Documents How to Use This GuideFollowing conventions are used in this guide Conventions Used in This GuideConventions Used in This Guide Xvi About This Guide Overview IntroductionA2H254-16 Stack Connections Redundant Power Supply CapabilityDescription of Mini-GBICs ConnectivityManagement Lanview Diagnostic LEDsSwitch Configuration Using WebView Switch Configuration Using CLI CommandsGetting Help 10BASE-TX Twisted Pair Network Network Requirements100BASE-FX Multimode Fiber-Optic Network 100BASE-TX Twisted Pair Network1000BASE-T Twisted Pair Gigabit Ethernet Network 1000BASE-FX Fiber-Optic Network 1000BASE-FX Fiber-Optic Network Network Requirements Hardware Installation Required Tools Considerations Prior to InstallationUnpacking the Switch Contents of Switch CartonPreparation Installing Optional Mini-GBICsInstallation Mini-GBIC with MT-RJ Connector Removing the Mini-GBIC Mini-GBIC with LC ConnectorInstalling the Rubber Feet Installing the Switch on a Flat SurfaceChassis Bottom, Rubber Feet Placement Guidelines for Flat Surface InstallationArea Guidelines for Switch Installation on Flat Surface Rack Mounting the SwitchAttaching Brackets and Installing in Rack Guidelines for Rackmount InstallationFastening the Switch to the Rack Connecting Stacking CablesAbout SecureStack A2 Switch Operation in a Stack Configuring Switches in a StackConfiguring Switches in a Stack Installing a New Stackable System of Up to Eight Switches Recommended Procedures for New and Existing StacksAC Power Connecting AC and RPS-SYS PowerSwitch Rear View 10 Accessing the RPS Connector C2RPS-SYS Redundant Power SystemStack Initialization Overview Connecting to Console Port for Local ManagementWhat Is Needed DB9 Male Console Port Pinout Assignments Connecting to an IBM or Compatible Device12 Connecting an IBM PC or Compatible Connecting to a VT Series Terminal13 Connecting a VT Series Terminal Connecting to a Modem14 Connecting to a Modem Connecting Fiber-Optic Cables to Fixed MT-RJ Ports Connecting to the Network15 Connecting a Fiber-Optic Cable Segment to MT-RJ Port Connecting Fiber-Optic Cables to MT-RJ Mini-GBIC Ports Connecting to the Network Connecting Fiber-Optic Cables to LC Mini-GBIC Ports Connecting to the Network 16 Connecting a UTP Cable Segment to RJ45 Port Connecting UTP Cables to RJ45 PortsConnecting to the Network 17 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Initial Logon to Switch Management Completing the InstallationCompleting the Installation Hardware Installation This chapter provides information concerning the following TroubleshootingLanview LEDs of A2H254-16 Using LanviewColor State Recommended Action Lanview LEDsDown RPS Configuration Guide for proper setup Troubleshooting ChecklistConfiguration Guide for the IP address Reset Password Button Using the Reset Password ButtonTable A-1 A2H254-16 Switch Specifications SpecificationsSwitch Specifications Environmental PhysicalTable A-2 Mini-GBIC Input/Output Port Specifications Mini-GBIC Input/Output SpecificationsMGBIC-LC03 Specifications 1000BASE-SX Gigabit Ethernet SpecificationsMGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX MGBIC-LC09 Specifications 1000BASE-LX Table A-11 MGBIC-02 Specifications MGBIC-08 Specifications 1000BASE-ELXMGBIC-02 Specifications 1000BASE-T Table A-9 MGBIC-08 Optical SpecificationsTable A-12 Compliance Standards Regulatory Compliance Console Port Pinout AssignmentsRegulatory Compliance Regulatory Compliance Specifications Numerics IndexIndex-2