Enterasys Networks 9034096-02, 6H303-48 manual 4G4202-72, 4G4282-49

Page 23

The DFE-Gold Modules and Interface Options

4G4202-72

The 4G4202‐72 is an edge‐network switch with 72, 10BASE‐T/100BASE‐TX/1000BASE‐T ports accessed through 72 front‐panel RJ45 connectors.

4G4282-49

The 4G4282‐49 is an edge‐network switch with 48, 10BASE‐T/100BASE‐TX/1000BASE‐T compliant ports accessed through 48 fixed front‐panel RJ45 connectors and a slot for an optional network expansion module. The 7G‐6MGBIC and 7G‐6MGBIC‐A can support up to 6 Gigabit ports by means of optional Mini‐GBICs.

Matrix DFE-Gold Series Installation Guide 1-3

Image 23
Contents Enterasys Matrix Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Safety Information Class 1 Laser Transceivers Enterasys NETWORKS, INC. Firmware License Agreement Viii Page Page Contents Index TroubleshootingAppendix a Specifications Appendix B Mode Switch Bank Settings Optional InstallationsFigures Tables Important Notice About This GuideWho Should Use This Guide For Refer to How to Use This GuideRelated Documents Following conventions are used in this guide Conventions Used in This GuideConventions Used in This Guide Xvi About This Guide For information about Refer to IntroductionDFE-Gold Modules and Interface Options Overview of DFE Series Capabilities4G4282-49 4G4202-724G4202-72 and 4G4282-49 DFE-Gold Modules 7G-6MGBIC and 7G-6MGBIC-A Gigabit Ethernet Interface Modules Management Switch Configuration Using WebViewConnectivity Secure Networks Policy Support Switch Configuration Using CLI CommandsStandards Compatibility Getting Help Lanview Diagnostic LEDsLink Aggregation Network Requirements1000BASE-SX/LX/ELX Network 10BASE-T Network100BASE-TX Network 1000BASE-T Network 1000BASE-T Network Network Requirements Important Notice InstallationUnpacking the DFE-Gold Module Installing Optional Network Expansion ModulesContents of DFE-Gold Module Carton Quantity Removing the Coverplate Installing the Network Expansion ModuleInstalling the Network Expansion Module Preparation Installing an Optional Mini-GBICMini-GBIC with MT-RJ Connector InstallationMini-GBIC with LC Connector Removing the Mini-GBIC N5 POE Module Placement and RulesExample 4 -6, D Example 1 -6, aExample 2 -6, B Example 3 -6, CInstalling the DFE Module into a Chassis To install the module, refer to ‐1 and proceed as follows Installing Module into Matrix E7 or N7 ChassisCard guides Installing Module into Matrix N1, N3, or N5 Chassis Installing Module into N1, N3, or N5 Chassis only N3 shown Connecting to the NetworkConnecting UTP Cables DFE RX+ TX+ TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Connecting Fiber-Optic Cables to Mini-GBICs 13 Cable Connection to MT-RJ Fiber-Optic Connectors 14 Cable Connection to LC Fiber-Optic Connectors What Is Needed Connecting to COM Port for Local ManagementParameter Setting Connecting to an IBM PC or Compatible Device15 Connecting an IBM PC or Compatible Device Connecting to a VT Series Terminal16 Connecting a VT Series Terminal Connecting to a Modem17 Connecting to a Modem RJ45 DB25 Adapter Wiring and Signal AssignmentsCOM Port Adapter Wiring and Signal Diagram RJ45 VT Series Port Adapter Wiring and Signal DiagramModem Port Adapter Wiring and Signal Diagram Completing the InstallationCompleting the Installation of a New System First-Time Log-In Using a Console Port Connection 18 Matrix DFE Startup Screen Example N7 Chassis Logging in with an Administratively-Configured User Account About the Management Mgmt LED TroubleshootingUsing Lanview 4G4282-49 Viewing the Receive and Transmit ActivityColor State Recommended Action LEDAmber Alternating 67% on, 33% and off off. Indicates that a Refer to the Matrix DFE-Gold Series Configuration Troubleshooting ChecklistMatrix DFE-Gold Series Configuration Guide for DFE-Gold Module Shutdown ProcedureOFFLINE/RESET Switch Recommended Shutdown Procedure Using OFFLINE/RESET SwitchLast Resort Shutdown Procedure Using OFFLINE/RESET Switch Table A-1 Specifications SpecificationsDFE-Gold Module Specifications Processors/Memory Ethernet Interface Module SpecificationsTable A-3 Mini-GBIC Input/Output Port Specifications Mini-GBIC Input/Output SpecificationsMGBIC-LC03 Specifications 1000BASE-LX Gigabit Ethernet SpecificationsMGBIC-LC01 / MGBIC-MT01 Specifications 1000BASE-SX Table A-10 MGBIC-08 Optical Specifications MGBIC-LC09 Specifications 1000BASE-LXMGBIC-08 Specifications 1000BASE-ELX Table A-11 MGBIC-08 Operating Range 1550 nm MGBIC-02 Specifications 1000BASE-TTable A-12 MGBIC-02 Specifications Table A-14 Compliance Standards Regulatory Compliance COM Port Pinout AssignmentsRegulatory Compliance Regulatory Compliance Specifications Required Tools Mode Switch Bank Settings Optional InstallationsSetting the Mode Switches Figure B-1 Mode Switch Location on 4G4202-72 and 4G4282-49 Location of Dram Simm and Dimm Memory Modules Memory Locations and Replacement ProceduresRemoving the Dram Simm Dram Simm Replacement ProcedureFigure B-5 Removing the Existing Dram Simm from 4G4282-49 Figure B-6 Installing the Dram Simm on 4G4282-49 Installing the Dram Simm on 4G4282-49Removing the Dimm Dimm Replacement ProcedureFigure B-8 Installing the Dimm on 4G4202-72 or 4G4282-49 Installing the Dimm on 4G4202-72 or 4G4282-49Numerics IndexIndex-2