Unpacking the
For information about... | Refer to page... |
|
|
Completing the Installation | |
|
|
Unpacking the DFE-Gold Module
Unpack the DFE‐Gold module as follows:
1.Open the box and remove the packing material protecting the DFE‐Gold module.
2.Verify the contents of the carton as listed in Table 3‐1.
Table 3-1 Contents of DFE-Gold Module Carton
Item | Quantity |
|
|
1 | |
|
|
This Installation Guide | 1 |
|
|
Customer Release Notes | 1 |
|
|
3.Remove the tape seal on the non‐conductive bag to remove the DFE module.
4.Perform a visual inspection of the DFE‐Gold module for any signs of physical damage. Contact Enterasys Networks if there are any signs of damage. Refer to “Getting Help” on page 1‐8 for details.
Installing Optional Network Expansion Modules
Note: Install any optional equipment before proceeding to “Module Placement and Rules” on page
Installing a network expansion module involves
•removing the coverplate from the DFE‐Gold module,
•attaching the network expansion module to the DFE‐Gold module, and
•if required, installing the Mini‐GBICs.
Caution: An antistatic wrist strap is required to perform the following procedures to minimize ESD damage to the devices involved.
Precaución: Para minimizar los efectos de las descargas de electricidad estática, deberá utilizar una pulsera antiestática al realizar los siguiente procedimientos.