Enterasys Networks 4G4282-49, 6H303-48, 9034096-02 manual Viewing the Receive and Transmit Activity

Page 66

Using LANVIEW

Viewing the Receive and Transmit Activity

On the 4G4202‐72 and 4G4282‐49, you can view the receive and transmit activity on the RX and TX LEDs. However, only one group of ports may be viewed at a time. On the 4G4282‐49, there are 12 ports per group. On the 4G4202‐72, there are 24 ports per group.

To view the receive and transmit activity on a group of attached segments, press the GROUP SELECT button (see Figure 4‐1) to step to the group of interest (Groups 1–3 for the 4G4202‐72, and Groups 1–5 for the 4G4282‐49). Each time the GROUP SELECT button is pressed, the GROUP LED lights up in sequence, indicating which group is selected. The receive and transmit activity for that group of segments is then indicated by the RX and TX LEDs for each port.

Figure 4-1 LANVIEW LEDs

 

4G4202-72

Gb ENET

 

4G4202-72

 

OFFLINE/

 

RESET

 

COM

GROUP 1 GROUP 2

À

GROUP 3

 

1 2 3

GROUP

GROUP

SELECT

RX

TX

Á

1 2 3

GROUP

GROUP

SELECT

Gb ENET

4G4282-49

4G4282-49

1

1MGMT LED

OFFLINE/

RESET

COM

MGMT CPU

GROUP

SELECT

GROUP

1 1

2 2

3 3

4 4

À

GROUP

SELECT

GROUP

1 1

RX TX Á

2Group 1, Port 1 LEDs

4-2 Troubleshooting

Image 66
Contents Enterasys Matrix Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Safety Information Class 1 Laser Transceivers Enterasys NETWORKS, INC. Firmware License Agreement Viii Page Page Contents Appendix B Mode Switch Bank Settings Optional Installations TroubleshootingAppendix a Specifications IndexFigures Tables About This Guide Who Should Use This GuideImportant Notice How to Use This Guide Related DocumentsFor Refer to Conventions Used in This Guide Following conventions are used in this guideConventions Used in This Guide Xvi About This Guide Introduction For information about Refer toOverview of DFE Series Capabilities DFE-Gold Modules and Interface Options4G4202-72 4G4282-494G4202-72 and 4G4282-49 DFE-Gold Modules 7G-6MGBIC and 7G-6MGBIC-A Gigabit Ethernet Interface Modules Switch Configuration Using WebView ConnectivityManagement Switch Configuration Using CLI Commands Standards CompatibilitySecure Networks Policy Support Lanview Diagnostic LEDs Getting HelpNetwork Requirements Link Aggregation10BASE-T Network 100BASE-TX Network1000BASE-SX/LX/ELX Network 1000BASE-T Network 1000BASE-T Network Network Requirements Installation Important NoticeInstalling Optional Network Expansion Modules Contents of DFE-Gold Module Carton QuantityUnpacking the DFE-Gold Module Installing the Network Expansion Module Removing the CoverplateInstalling the Network Expansion Module Installing an Optional Mini-GBIC PreparationInstallation Mini-GBIC with MT-RJ ConnectorMini-GBIC with LC Connector Removing the Mini-GBIC Module Placement and Rules N5 POEExample 3 -6, C Example 1 -6, aExample 2 -6, B Example 4 -6, DInstalling the DFE Module into a Chassis Installing Module into Matrix E7 or N7 Chassis To install the module, refer to ‐1 and proceed as followsCard guides Installing Module into Matrix N1, N3, or N5 Chassis Connecting to the Network Installing Module into N1, N3, or N5 Chassis only N3 shownConnecting UTP Cables DFE RX+ TX+ TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Connecting Fiber-Optic Cables to Mini-GBICs 13 Cable Connection to MT-RJ Fiber-Optic Connectors 14 Cable Connection to LC Fiber-Optic Connectors Connecting to COM Port for Local Management What Is NeededConnecting to an IBM PC or Compatible Device Parameter SettingConnecting to a VT Series Terminal 15 Connecting an IBM PC or Compatible DeviceConnecting to a Modem 16 Connecting a VT Series Terminal17 Connecting to a Modem VT Series Port Adapter Wiring and Signal Diagram Adapter Wiring and Signal AssignmentsCOM Port Adapter Wiring and Signal Diagram RJ45 RJ45 DB25Completing the Installation Completing the Installation of a New SystemModem Port Adapter Wiring and Signal Diagram First-Time Log-In Using a Console Port Connection 18 Matrix DFE Startup Screen Example N7 Chassis Logging in with an Administratively-Configured User Account Troubleshooting Using LanviewAbout the Management Mgmt LED Viewing the Receive and Transmit Activity 4G4282-49LED Color State Recommended ActionAmber Alternating 67% on, 33% and off off. Indicates that a Troubleshooting Checklist Refer to the Matrix DFE-Gold Series ConfigurationDFE-Gold Module Shutdown Procedure Matrix DFE-Gold Series Configuration Guide forRecommended Shutdown Procedure Using OFFLINE/RESET Switch OFFLINE/RESET SwitchLast Resort Shutdown Procedure Using OFFLINE/RESET Switch Specifications DFE-Gold Module SpecificationsTable A-1 Specifications Ethernet Interface Module Specifications Processors/MemoryMini-GBIC Input/Output Specifications Table A-3 Mini-GBIC Input/Output Port SpecificationsGigabit Ethernet Specifications MGBIC-LC01 / MGBIC-MT01 Specifications 1000BASE-SXMGBIC-LC03 Specifications 1000BASE-LX MGBIC-LC09 Specifications 1000BASE-LX MGBIC-08 Specifications 1000BASE-ELXTable A-10 MGBIC-08 Optical Specifications MGBIC-02 Specifications 1000BASE-T Table A-12 MGBIC-02 SpecificationsTable A-11 MGBIC-08 Operating Range 1550 nm COM Port Pinout Assignments Regulatory ComplianceTable A-14 Compliance Standards Regulatory Compliance Regulatory Compliance Specifications Mode Switch Bank Settings Optional Installations Setting the Mode SwitchesRequired Tools Figure B-1 Mode Switch Location on 4G4202-72 and 4G4282-49 Memory Locations and Replacement Procedures Location of Dram Simm and Dimm Memory ModulesDram Simm Replacement Procedure Removing the Dram SimmFigure B-5 Removing the Existing Dram Simm from 4G4282-49 Installing the Dram Simm on 4G4282-49 Figure B-6 Installing the Dram Simm on 4G4282-49Dimm Replacement Procedure Removing the DimmInstalling the Dimm on 4G4202-72 or 4G4282-49 Figure B-8 Installing the Dimm on 4G4202-72 or 4G4282-49Index NumericsIndex-2