BridgeWave installation manual SLE100 Fast Ethernet Links

Page 1

Making connections in a high-speed world

SLE100 Fast Ethernet Links

Installation Manual

P/N 590-00532

Revision A

June 2008

Image 1
Contents SLE100 Fast Ethernet Links Export Control Copyright Notice & DisclaimerProduct Compatibility Safety Regulatory Information Equipment PrecautionsTable of Contents Purpose of Manual IntroductionPrior Knowledge Return Material Authorization RMA Technical Assistance and Customer ServiceContact Information BridgeWave SalesSite Planning Equipment ChecklistGeneral Line of Sight LOSCabling Antenna LocationGrounding & Lightning Cabling DiagramEnvironmental Equipment Unpacking InstallationEquipment Inventory Qty DescriptionDescription Qty Installation Tools Wall Mounting Instructions Radio Mount InstallationAttaching the Yoke to the Mounting Bracket Wall Mount Hole Drilling Template Pole Mounting Instructions Pole-Mount Bracket AssemblyAttaching Pole Mount Brackets to Wall Mount Bracket Attaching Pole Mount Brackets and Yoke to Pole Polarization Diamond Orientations Radio InstallationAttaching the Radio to the Yoke Perform steps 1 -3 on both ends of the link Cable Installation SLE100 Installation Manual Introduction Optional Ice Shield Canopy InstallationOptional Kit Installation InstructionsAttaching the Ice Shield Re-install the O bolt Antenna Alignment Mirror Ig h tWrong 11 RSL & Qual Test Leads Qual & RSL Test Cable12 RSL and Quality Test Cable Connection Point 14 Radio Link Up and Power LED’s Network Port Statistics Configuring Network EquipmentProblem Possible Cause Resolution Appendix a TroubleshootingSLE100 Installation Manual Appendix B RSL Voltage vs. Distance Limited Hardware Warranty Std. Limited Warranty & SW LicenseLimitation of Remedy and Liability Provisions