BridgeWave SLE100 installation manual Table of Contents

Page 5

TM

SLE100 Installation Manual

Table of Contents

 

Copyright Notice & Disclaimer

ii

 

Export Control

ii

 

Product Compatibility

ii

 

Safety

...........................................................

iii

 

Regulatory Information

iv

 

Equipment Precautions

iv

1

Introduction

1

 

1.1

Purpose of Manual

1

 

1.2

Prior Knowledge

1

 

1.3

Contact Information

2

2

Site Planning

3

 

2.1

General

3

 

2.2

Equipment Checklist

3

 

2.3

Line of Sight (LOS)

3

 

2.4

Link Distance

3

 

2.5

Antenna Location

4

 

2.6

Cabling

4

 

2.7

Grounding & Lightning

5

 

2.8

Environmental

6

3

Installation

7

 

3.1

Equipment Unpacking

7

 

3.2

Equipment Inventory

7

 

3.3

Installation Tools

9

 

3.4

Radio Mount Installation

10

 

3.5

Radio Installation

16

 

3.6

Cable Installation

19

3.7Optional Ice Shield Canopy

Installation

21

3.8

Antenna Alignment

24

3.9

QUAL & RSL Test Cable

27

4 Configuring Network Equipment

30

4.1

Network Port Statistics

30

Appendix A: Troubleshooting

31

Appendix B: RSL Voltage vs. Distance

33

Std. Limited Warranty & SW License

34

v

590-00532, rev A

Image 5
Contents SLE100 Fast Ethernet Links Product Compatibility Copyright Notice & DisclaimerExport Control Safety Regulatory Information Equipment PrecautionsTable of Contents Prior Knowledge IntroductionPurpose of Manual Return Material Authorization RMA Technical Assistance and Customer ServiceContact Information BridgeWave SalesSite Planning Equipment ChecklistGeneral Line of Sight LOSCabling Antenna LocationGrounding & Lightning Cabling DiagramEnvironmental Equipment Unpacking InstallationEquipment Inventory Qty DescriptionDescription Qty Installation Tools Wall Mounting Instructions Radio Mount InstallationAttaching the Yoke to the Mounting Bracket Wall Mount Hole Drilling Template Pole Mounting Instructions Pole-Mount Bracket AssemblyAttaching Pole Mount Brackets to Wall Mount Bracket Attaching Pole Mount Brackets and Yoke to Pole Polarization Diamond Orientations Radio InstallationAttaching the Radio to the Yoke Perform steps 1 -3 on both ends of the link Cable Installation SLE100 Installation Manual Introduction Optional Ice Shield Canopy InstallationOptional Kit Installation InstructionsAttaching the Ice Shield Re-install the O bolt Antenna Alignment Mirror Ig h tWrong 11 RSL & Qual Test Leads Qual & RSL Test Cable12 RSL and Quality Test Cable Connection Point 14 Radio Link Up and Power LED’s Network Port Statistics Configuring Network EquipmentProblem Possible Cause Resolution Appendix a TroubleshootingSLE100 Installation Manual Appendix B RSL Voltage vs. Distance Limited Hardware Warranty Std. Limited Warranty & SW LicenseLimitation of Remedy and Liability Provisions